Slew & Height Limiters

The Webbair IMC motion limiting system. An engineering control that physically stops a machine reaching where it must not go — not a warning, not a procedure.

Slew, height, radius & depth limits

Proportional hydraulic cut

Exclusively distributed by Red Edge

What it is

Intelligent Motion Control

The Webbair IMC is an Australian-made motion limiting system that measures where a machine’s boom, arm and house actually are, and cuts the hydraulic function before they can reach a boundary you have set.

Gyro-assisted angle sensors track the boom and arm. A slew sensor tracks rotation. When any of those approach a programmed limit, proportional cut valves ramp the relevant function down and stop it. The operator sees why on a 4.3″ colour touchscreen, and every event is logged.

Red Edge Resources is the exclusive Australian distributor. We specify the configuration for your machine and your site, fit it, commission the limits against the distances your electricity entity or principal contractor has given you, and support it from Brisbane.

Why this matters

Procedures are not a control. The regulator has said so.

If you are trying to justify the cost of a limiter, this is the argument. It is not ours — it is Resources Safety & Health Queensland’s, in a safety notice on mobile plant contacting energised overhead powerlines.
RSHQ’s position, paraphrased: mines and quarries must implement effective controls that prevent mobile plant from entering the exclusion zones of energised overhead powerlines. Worker training, procedures, risk assessments and other administrative processes are not effective controls — they may document and communicate what controls are required, but they are not the control itself.

The incidents behind that notice are the ones every operator recognises. A drill rig slewed with the boom raised near an 11,000 V line and the operator watched the electricity arc across. A 40 tonne excavator walking a dam access road pulled down 11,000 V lines and started a bushfire. A crane contacted a SWER line after the safety observer stepped away to control traffic on the access road.

That last one is the whole argument. The spotter was competent, the procedure existed, and the procedure required the spotter to be watching. He was doing something else for a minute. An engineering control does not step away.

This is not only a mining question. The same logic applies on civil sites, in rail corridors, in demolition and anywhere a principal contractor is being asked what physically prevents an incident rather than what discourages one.

Where the envelope goes

Set it outside all three zones

Zones around an energised overhead electric line An excavator working near an overhead powerline. Three nested zones surround the conductors themselves: a safety observer zone on the outside, an exclusion zone inside that, and a no-go zone at the conductors. A limiter envelope is programmed outside all three so the machine cannot physically reach them. Limiter envelope set to stop the machine short of all three zones No-go zone Exclusion zone Safety observer zone Programmed limiter envelope Zone distances are not universal. They depend on the voltage, on your state, and on whether a trained safety observer has been appointed. Get them from your electricity entity in writing, then we set the envelope to match.
Three zones, one envelope. The limiter is programmed to stop the machine outside all of them, with margin for the ramp-down. Distances come from your electricity entity, not from us and not from a rule of thumb.

Overhead electric lines in Australia are surrounded by a layered set of zones: a no-go zone at the conductors, an exclusion zone around that, and a safety observer zone outside both. The distances depend on the voltage, on which state you are in, and on whether a trained safety observer has been appointed.

We do not guess at those distances and neither should you. Get them in writing from your electricity entity — Energex, Ergon, Ausgrid, Endeavour, SA Power Networks, Western Power or whoever holds the asset — and we will programme the envelope to sit outside them with margin. If someone offers to set your limits without asking who the electricity entity is, that should worry you.

Be clear on this before you buy

What a motion limiter does, and what it does not

This is a safety control on a machine that can kill people. Overselling it is how a site ends up believing it is protected when it is not.

It does

It does not

This is not our caveat — it is the manufacturer’s, on every start-up. Read the DO list: put the attachment in its worst-case position when setting a limit, check the limit is correct once set, and re-set limits after travel. Read the DO NOT: never move quickly when close to a limit. Then read the line in red — safe operation of the machine remains the responsibility of the operator. That is the honest scope of this product, printed on the device.
About the override. The IMC has an emergency override facility, and it needs one — a machine that cannot be recovered when a limit traps it in an awkward position is its own hazard. But an override is a bypass, and a bypass that nobody reviews is a control that quietly stops existing. The supervisor key restricts who can change limits, and event logging records every override. Use the log. If a machine is overriding daily, either the limits are set wrong or the work has changed, and both are worth knowing about before an incident tells you.
The supervisor key. A keyed LIMIT / SET switch, so limits are changed by authorised people rather than by whoever is in the seat. Deciding who holds this key is a real decision, not an administrative one.

What it enforces

Six limits, all measured from the machine

The limits a motion limiter enforces Left, a plan view showing the permitted slew sector between two point-to-point limits with a virtual wall along one side. Right, a side elevation showing a height ceiling, a maximum radius and a dig depth floor. All limits are measured from the machine itself. SLEW LIMITS — PLAN Limit B Limit A permitted barred virtual wall HEIGHT, RADIUS AND DEPTH — ELEVATION height ceiling max radius dig depth floor cab protection Every one of these is measured from the machine, not from the hazard. The system knows its own boom, arm and slew position. It does not know where the powerline is. Track the machine and the limits travel with it.
Six limits, all machine-relative. Slew sector, virtual wall, height ceiling, maximum radius, dig depth and cab protection. None of them are anchored to the hazard — they are anchored to where the machine was standing when they were set.
Point-to-point slew limits bar a sector of rotation. A virtual wall holds a straight line — a site boundary, a rail corridor edge, a building face. A height ceiling stops the boom rising into anything overhead. Max radius keeps the machine inside its footprint. Dig depth protects services below. Cab protection stops the attachment reaching the operator.
Normal operationAll limit indicators green. Slew angle top right, event log reachable from the home screen.
Slew limit reachedBarred sectors hatched, current slew angle shown, rotation stopped in that direction.
Virtual corridorDistance to each wall displayed live. Boom arrows turn red for the movements now barred.
Actual IMC screens. Green means the movement is available; red means it has been cut.
The critical caveat is in the diagram. Every one of these is measured from the machine’s own sensors, not from the hazard. The system has no idea where the powerline is; it only knows the envelope you taught it while the machine was standing where it was standing. This is the single most misunderstood thing about motion limiters, and it is why commissioning and operator training matter as much as the hardware.

Configurations

Two levels

Entry

Height limiter

Height limiting only, with the same proportional hydraulic control and the same data logging as the full system.

Right when the hazard is purely overhead — a powerline crossing, a bridge soffit, a conveyor, a roof structure — and rotation is not the risk.

Full IMC

Height and slew limiting

Adds point-to-point slew limiting, virtual walls, dig depth, cab protection, maximum radius and iVoice spoken messages.

Right when the hazard has a direction — a live rail corridor beside you, a road, an adjacent building, an occupied structure, a shared work area.

Gyro-assisted angle sensors

Boom and arm position measured continuously. Gyro assistance keeps the reading stable while the machine is moving rather than only when it is still.

Proportional cut valves

Function ramps down into the limit instead of slamming shut. Better for the machine, better for the operator, and less likely to shift a suspended load.

4.3″ colour touchscreen

Shows current geometry, which limits are active and which one is being approached. Legible in a cab in daylight.

Supervisor key switch

Limits are changed by authorised people, not by whoever is in the seat. This is what makes the setting a control rather than a suggestion.

Event logging

Limit approaches, limit stops and overrides are recorded. Useful for audit, useful for investigation, and useful for spotting a machine that is fighting its own limits every day.

iVoice spoken messages

Spoken warnings instead of another beeper. On a machine that already has five alarms, a voice that says what is wrong cuts through where a tone does not.

Rail corridor

A configuration built for working next to live track

Rail is where motion limiting is most often specified outright, because the adjacent hazard is continuous, moving and unforgiving, and because a virtual wall along the corridor edge is exactly the control the safeworking plan is asking for.

Motion limiting

Fully proportional height and slew control, with a virtual wall holding the machine clear of the corridor regardless of how the operator moves the joysticks.

Proximity detection

IPD covering the rear and right-hand side with variable detection zones for people and objects, and motion cut on detection.

Machine state monitoring

GPS speedometer and variable pitch and roll warnings, so the machine is monitored for its own stability as well as its reach.

Attachment selection

The geometry changes when the attachment changes. Selecting the attachment keeps the limits correct rather than approximately correct.
Tell us the standard, not just the machine. Rail authorities and principal contractors write their own requirements for plant working near live track, and they differ. Send us the clause you have been given and we will tell you plainly whether this configuration satisfies it — including if it does not.

Applications

Where it earns its place

Overhead powerlines

Any machine working within reach of an energised line. The most common reason a limiter gets fitted, and the one with the worst consequences when it is not.

Live rail corridors

Virtual wall along the corridor edge, often combined with proximity detection on the track side.

Urban and confined sites

Adjacent buildings, footpaths, live traffic lanes and neighbouring properties. Slew limits keep the machine inside the site regardless of operator judgement.

Demolition

Height ceilings and exclusion sectors around structures that must not be touched, and cab protection with heavy attachments at reach.

Tunnels and low clearance

Height limiting under bridges, conveyors, gantries and portal structures where an overreach damages infrastructure as well as the machine.

Lifting duties

Maximum radius limiting on excavators used for lifting, keeping the machine inside the working envelope you have planned for.

How we deploy it

The commissioning is the product

Anyone can bolt sensors to a boom. What makes this a control rather than a gadget is that the limits are correct, the operator understands them, and the setting cannot be casually changed.
01

Establish the real distances

Which electricity entity, what voltage, what zone distances, what your principal contractor requires, and whether a safety observer is mandated regardless. In writing, before anything is fitted.
02

Specify for the machine and the attachment

Sensor positions, valve integration into the machine’s hydraulics, and which limits you actually need. Fitting six limits where two are required just gives operators more to override.
03

Install and integrate

Fitted on site or in your yard by our technicians, with proportional cut valves plumbed into the machine’s hydraulic circuits and the display mounted where the operator can actually see it.
04

Commission and physically prove each limit

Every limit tested by driving the machine into it and confirming where it stops, including with the attachment fitted and at working speed. A limit that has not been proven is an assumption.
05

Train the operators on the caveats

What the system stops, what it does not know, why the limits must be reset when the machine tracks, and what the override is for. Operators who understand a control use it. Operators who think it is infallible eventually find out that it is not.
06

Set up the review

Who holds the supervisor key, who reads the event log, and how often. A control nobody reviews degrades quietly. We will help you put that routine in place.

Questions

Frequently asked

Not automatically, and do not assume it. Where your electricity entity, regulator or principal contractor requires a safety observer, a limiter does not remove that requirement. What it does is stop the outcome depending entirely on one person staying focused. Treat it as an additional engineering control, and get any reduction in other controls agreed in writing by whoever set them.

Yes, through an emergency override, and it needs to be possible — a machine stuck against a limit in a bad position is its own hazard. But overrides are logged, and changing the limits themselves requires the supervisor key. The system makes bypassing visible rather than impossible, which is the right design; what matters is that someone reads the log.

The limits are measured from the machine, so they travel with it. A slew limit or virtual wall set at one standing position is not valid once the machine has moved. Webbair say so themselves: the IMC start-up screen instructs the operator to re-set limits after travel. Making that part of the work method is not optional, and it is the thing we spend most of the operator training on. Talk to us about how your crews work so we can set this up to suit.

No, and you would not want it to. The proportional valves ramp the function down into the limit. That means there is a deceleration distance, which grows with slew speed and attachment weight. We account for it when we set the envelope, which is part of why the limits are commissioned with your actual attachment fitted rather than calculated on paper. The start-up screen also tells operators not to move quickly when close to a limit, for the same reason.

Send us the clause. Requirements for plant near powerlines and live rail vary between authorities, states and contractors. We will read it and give you a straight answer about whether this configuration meets it, including where it does not and what else you would need.

It is designed for versatile fitment across excavators, cranes and loaders. Whether it suits your specific machine depends on the hydraulic system and how the controls are arranged, so tell us the make, model and year and we will confirm before quoting rather than after.

It varies with the machine and how many limits are being fitted, because the valves integrate into the hydraulic circuits. Commissioning and proving every limit takes real time on top of the fitting, and we would rather quote that honestly than surprise you. Ask us for a time estimate on your specific machine.

Yes, across Australia and New Zealand, with our technical and repair base in Brisbane.

Tell us the hazard, not just the machine

What is the machine working near, who owns it, and what distances have you been given? With those three answers we can tell you which configuration you need, what it will and will not cover, and what your crews will have to do differently.
Phone
Based in
Brisbane, Queensland
Servicing
Australia & New Zealand