What’s In a Hemisphere Machine Control Quote

Use this as a checklist
Take it into every quote conversation. Anything not addressed explicitly should be treated as excluded until confirmed in writing.
Hardware
☐ Receiver — VR1000 or VR500? Confirm which, and why that one for your application.
☐ GNSS antennas — how many, which model.
☐ Display — IronTwo, with mounting.
☐ Sensors — which sensors, on which components. For an excavator: boom, stick, bucket, chassis.
☐ Mounting hardware and cables — machine-specific.
☐ Base station — C631 included, excluded, or assumed to exist?
Workflow and licensing
☐ Which workflow — 2D, 2.5D, 3D, or all available?
☐ In-field design — included?
☐ Design file format support — confirm the formats you actually receive designs in.
☐ Unlock activation for other machine types — included, and at what cost if used later?
☐ Software licensing — perpetual or subscription, and what happens if a subscription lapses?
☐ Software updates — included, and how delivered?
Positioning
☐ Correction source — base station included, NTRIP subscription assumed, or excluded?
☐ Compatibility with existing site infrastructure — confirmed, if you have any.
☐ Radio — integrated in the receiver, or additional hardware?
Services
☐ Installation labour — included or separate, performed where.
☐ Machine downtime — how long, and does the machine travel?
☐ Calibration and commissioning — including the attachment library.
☐ Number of attachments configured — additional ones usually cost extra.
☐ Verification standard — what check is performed, what documentation you receive.
☐ Operator training — hours, operator count, location, follow-up session included?
Ongoing
☐ Preventative maintenance — scope, interval, cost.
☐ Support agreement — coverage, hours, response commitment.
☐ Warranty — duration, coverage, what voids it.
☐ Loan equipment — available during repair, at what cost?
☐ Travel charges for site attendance to your locations.
The usual exclusions
Machine downtime. Never quoted, always real.
Additional attachments. Beyond those specified.
Design data preparation, where you’re running a full 3D workflow.
Additional operator training. Turnover means more people than the quote covers.
Recalibration after repair or component change.
Damage repair. Not warranty.
Travel for site support, particularly outside metro areas.
Data connectivity where NTRIP is used.
Four questions that reveal the gaps
“What will I need to buy in the first twelve months that isn’t on this quote?”
“If this goes down on a remote site, what does getting it running again cost me?”
“What do years two and three cost, assuming nothing breaks?”
“If I add a machine in six months, what does that quote look like?”
An evasive answer to the first is itself the answer.
The fleet-coverage number
For GradeMetrix specifically, ask for one additional figure: the cost to cover your fleet, not per machine.
Because the system can move between machine types, the answer depends on what must be duplicated per machine (sensors, mounting, calibration) versus what can be shared (display, receiver, licence).
That fleet number is the one that actually matters, and it may look quite different from a per-machine comparison against a system that can’t move.
On comparing
The lowest quote with the fewest inclusions is not a saving — it’s a deferral. Line quotes up against this checklist on the same scope. Usually the apparent gap largely closes, and what remains is a difference in support, which is a legitimate thing to pay for.