Stonex drill & piling rig guidance

Every hole,
where the plan
says it goes.

GNSS guidance that puts the design in the cab. Operators navigate straight to each hole or pile position from the digital plan — no pegs, no waiting on the survey crew, and an as-drilled record when it’s done.

Blast hole drilling

Solar farm piling

Foundation & civil piling

Retrofits existing rigs

The bottleneck

The rig waits
for the pegs

On a traditional set-out, a survey crew marks every hole or pile position before the rig can start. On a pattern of a few dozen holes that’s manageable. On a solar farm with tens of thousands of piles, or a production drill pattern that changes shift to shift, it becomes the thing everything else waits for.

Then the pegs get knocked out by traffic, buried by dust or moved by weather — and someone goes back to re-mark them. Meanwhile a rig that costs real money per hour is standing still, and the operator is guessing or waiting.

GNSS guidance removes the peg from the process entirely. The design goes into the cab, the operator navigates to each position on screen, and the survey crew is freed up for work that actually needs a surveyor.

The rig should be waiting on ground conditions, not on a peg.

How it works

Plan to hole,
in five steps

The system uses dual GNSS antennas mounted on the rig, which gives it both position and heading — so it knows not just where the machine is, but which way it’s facing and how the mast is oriented.
01

Load the plan

The drill pattern or pile schedule is uploaded to the in-cab tablet before the shift, straight from the design.
02

Navigate

The operator drives to the next position using on-screen guidance — distance and direction to target, updating live.
03

Position

Close in, the display guides fine positioning of the mast or drill head until it’s on the design location and the indicators go green.
04

Drill

Depth and angle are monitored against the plan, so the hole is right in three dimensions rather than just two.
05

Record

The as-drilled position is logged and the next position is selected automatically. No paperwork, no transcription.
On automated positioning. Where a rig’s hydraulics can be integrated, the system can take over fine positioning — the operator drives to within rough range and the rig positions the head onto the design point automatically. That capability depends on the rig, its hydraulic controls and what the manufacturer permits. It’s worth asking about for a fleet of identical machines; it isn’t universal, and we’d rather establish what’s possible on your specific rigs than promise it in advance.

Where it’s used

Four jobs where
this pays quickly

Mining & quarry

Blast hole drilling

Production drilling where the pattern changes regularly and hole placement affects fragmentation, dig rates and downstream cost.
Renewables

Solar farm piling

The application where guidance makes the biggest difference. A utility-scale solar farm can involve tens of thousands of near-identical piles across a very large area — the definition of a job where survey set-out becomes the bottleneck.
Civil construction

Foundation & civil piling

Bored piles, driven piles and screw piles for structures, bridges and infrastructure, where position tolerance is tight and the consequences of a misplaced pile are structural rather than cosmetic.
Infrastructure

Barrier, fence & post driving

Long linear runs of repetitive posts — safety barrier, fencing, signage — where chainage accuracy matters and marking every position by hand is slow.

Retrofit

You don’t need
a new rig

Existing fleets

Most rigs can be fitted
with what they already have

There’s a common assumption that machine guidance means buying a new rig with it factory-fitted. In practice most existing rigs can be retrofitted — and a mechanically sound rig with ten years left in it is a much better candidate for a guidance system than a capital replacement.

What we need to know to quote. Make, model and year of the rigs, how many, what you’re drilling or piling, the tolerance you’re held to, and what correction source you have available. That’s usually enough for an accurate answer — and we’ll tell you if a rig isn’t a sensible candidate.

What you get

Where the money
actually comes from

Four returns, in roughly the order operations tend to notice them.

Rig utilisation

The rig stops waiting on set-out. On repetitive work with a lot of positions, this is usually the largest single gain.

Survey crew freed up

Your surveyors move from marking positions to work that genuinely needs a surveyor — control, validation and as-builts.

Rework avoided

A misplaced pile is expensive to fix and worse to discover late. Accuracy at the drilling stage prevents downstream cost.

Production records

As-drilled data gives project managers visibility across the site without anyone compiling it by hand.
The safety return

Fewer people on foot
in an active pattern

The productivity case usually carries the purchase on its own. But it’s worth adding the second argument, because it costs nothing to include and changes who supports the business case.

Every position that doesn’t need marking is a person who doesn’t need to walk into an active drill pattern or piling area with rigs operating. That’s the same mechanism that produces the productivity gain, counted from the other direction.

Common questions

Before you call

With RTK corrections from a site base station or a network service, centimetre-level positioning is achievable in good conditions. Real-world accuracy depends on satellite availability, baseline length, atmospheric conditions and how the antennas are mounted. We’ll give you a realistic figure for your site and correction source rather than a best-case number from a datasheet.

Most rigs can be retrofitted. Send us the makes, models and years and we’ll confirm before quoting — and tell you if a particular rig isn’t a sensible candidate.

You need a correction source, which can be your own site base station or a network RTK service where coverage exists. On remote sites a base station is usually the answer, and it can feed your other machines and survey rovers at the same time — one datum across the whole site.

Sensors matched to the rig monitor mast angle and drilling depth against the plan, so the hole is correct in three dimensions rather than just position on the surface. The exact configuration depends on the rig.

Included, and hands-on in your rigs on your work. Operator confidence is what determines whether a system gets used properly or worked around — it’s not something to cover in a handover conversation.

Yes, and we’d recommend it on a larger fleet. Fit one, run it on real work for long enough to see the difference in cycle times, then decide. It’s a much better basis for a decision than a demonstration.

Tell us about

your rigs
Makes, models and how many, what you’re drilling or piling, and the tolerance you’re working to. We’ll come back with a configuration, an install plan and an indicative price — and we’ll be straight about which rigs are worth fitting and which aren’t.
Machine Control · Survey · Machine Safety · Monitoring · Field Support
Achievable accuracy depends on satellite availability, correction source, baseline length, atmospheric conditions, antenna mounting and rig configuration, and will vary between sites. Automated hydraulic positioning depends on the rig, its control system and manufacturer permissions, and is not available on all machines. Retrofit suitability is confirmed on a per-machine basis. Machine guidance supports the drilling and piling process; it does not replace engineering design, survey control, validation or site safety procedures. Specifications sourced from manufacturer documentation and subject to change without notice. Stonex is a trademark of Stonex Srl. All other trademarks are the property of their respective owners.