Setting Up a Base Station for Machine Control

Why own one
A base station buys independence. No mobile coverage dependency, no subscription, no reliance on a third party’s uptime. On a remote site it is often not a preference but a requirement.
It also introduces responsibilities that a subscription does not.
Siting
Sky view. The base needs a clear view of the sky. On a working site, that usually means elevated and away from structures, spoil stockpiles that will grow, and vegetation.
Away from the work. It cannot be somewhere that will be excavated, driven over, buried under a stockpile or disturbed by the works. Think about the site at the end of the project, not the start.
Radio line of sight. If corrections go by radio, the base needs to reach the machines. High points work better. Undulating sites may need a repeater.
Power. Mains, solar or battery, sized for continuous operation. A base that runs flat mid-shift stops the site.
Security. GNSS equipment on a stand in an accessible location is a theft target. Secure it, and consider what happens if it goes missing.
The known point
The base station sits on a point whose coordinates you know. Everything downstream inherits the quality of that point.
Establish it properly. Surveyed to an appropriate standard, tied to your site control.
Mark it permanently. A base that gets moved and re-established on a slightly different point produces a step change in everything measured after.
Protect it. Physically, and document its location so a replacement setup goes back on the same point.
Record everything. Coordinates, datum, height, antenna type and measurement method. This documentation is what lets someone re-establish the base correctly in six months when the person who set it up is gone.
Antenna height — the classic error
The single most common base station mistake in the industry: measuring antenna height incorrectly or recording the wrong measurement reference.
Get this wrong by 50mm and every machine on site is out by 50mm vertically. Consistently. Confidently. Without any error indication, because from the system’s point of view nothing is wrong.
Measure it carefully, record which reference point was measured to, and verify against a known point before releasing the site to work.
Radio versus internet delivery
Radio. No data dependency, no subscription. Limited by range and terrain. Stonex notes integrated UHF on the S850+ can reach up to 10km under optimal conditions — and “optimal” is load-bearing there. \[MFR] Real-world range in a pit or over undulating ground is substantially less.
Internet/NTRIP from your own base. Broadcast your base corrections over the internet, removing radio range limits — but reintroducing a data coverage dependency at the machine.
Many sites use radio as primary and internet as backup, or vice versa depending on coverage.
Verification before work starts
Non-negotiable, and frequently skipped:
Base established on the known point, antenna height measured and recorded
Machine or rover taken to a separate known control point
Position compared against the known coordinates
Result within tolerance, and recorded
Only then does work start
This catches antenna height errors, wrong point entry and datum mistakes — the failures that otherwise go undetected until conformance survey.
Ongoing management
Daily verification. A known-point check as part of the pre-start routine.
Change control. Any base move or re-establishment is a documented event, notified to everyone, with re-verification before work resumes.
One base per site. Multiple bases broadcasting different corrections is a genuine and expensive hazard.
Subcontractors on the same base. A subcontractor running their own base on their own control has reintroduced the whole problem. Handle it contractually.
\[VERIFY] — confirm which base station hardware Red Edge supplies and supports for Stonex machine control installations.
CTA: Red Edge Resources can specify, supply and set up base station infrastructure for your sites.
Pre-publish flags: \[VERIFY] base station hardware supplied. \[MFR] UHF range — retain the “optimal conditions” qualifier.