The 3D Pro Data Workflow Explained
The framing that helps
Stonex splits 3D Pro work into two phases, and it is a genuinely useful way to think about it:
OFF-MACHINE — everything done in the office and in the field to generate and georeference the project.
ON-MACHINE — using that project to excavate.
The distinction matters because contractors buy the on-machine part and frequently do not plan for the off-machine part. That is the most common reason a 3D system underdelivers.
Unlike 1D and 2D, where an operator can set up what they need in the cab, a 3D Pro project requires several steps before a machine starts.
The OFF-MACHINE phase
- Obtain the design. From the designer, engineer or client. In a format that can be worked with — which is not guaranteed, and is worth establishing contractually at the start of a project rather than discovering at the start of earthworks.
- Convert to a usable model. Design drawings and machine-ready models are not the same thing. Producing a surface the machine can work to is real work with real skill attached.
- Georeference it. The model must sit correctly in the site coordinate system. Stonex supports importing georeferenced projects including DXF.
\[VERIFY]— confirm the full current supported format list. - Establish site control. Control points, surveyed to an appropriate standard, distributed across the work area.
- Calibrate the site. Tie GNSS positioning to the site coordinate system so machines and rovers work on a consistent datum.
- Verify. Check the calibration against independent known points before releasing anything to machines.
- Distribute. Get the correct, current model to every machine that needs it.
The ON-MACHINE phase
By comparison, straightforward: load the project, verify against a known point, work to the design, with real-time cut and fill displayed.
That asymmetry is the point. Most of the work happens before the machine starts.
Who owns it
The question that decides whether 3D succeeds.
On a large project, a dedicated engineer or surveyor. On a mid-sized contractor, usually a portion of an existing engineer’s or surveyor’s week — and it needs to be an acknowledged portion, not an assumption.
What does not work: leaving it to whoever is free, or expecting the operator to sort it out. The operator’s job is on-machine.
Version control
The failure mode that costs the most:
Design revisions happen. If machine 1 is on revision C and machine 2 is on revision D, both are working confidently and one is wrong. Nobody finds out until conformance.
Minimum discipline:
One authoritative source for current models
Clear revision identification, visible on the machine
A defined process for pushing updates to every machine
Confirmation that each machine has the current version before work on a revised area
A record of which revision was used where, for as-built purposes
The cost nobody quotes
Data management does not appear on a hardware quote and it is a genuine ongoing cost: the time to prepare models, the software to do it, the person’s hours, and the training to do it competently.
Budget it explicitly. A 3D system with no data management resource is a 3D system that will be run in 2D mode within a few months.
The test before you buy
Ask yourself three questions:
Can I reliably get design data in a usable format on my projects?
Do I have someone who can prepare and georeference models, or can I train them?
Have I allowed time for this in my project resourcing?
Three yeses and 3D Pro will deliver. Any no needs resolving first — and it is cheaper to resolve it before the purchase than after.