What’s In a Stonex Machine Control Quote
Use this as a checklist
Take it into the conversation. Anything not addressed explicitly should be treated as excluded until confirmed in writing.
Configuration
☐ Which tier — 1D, 2D, 2D½ or 3D Pro? The single biggest cost driver and the first thing to pin down.
☐ Sensor configuration — which sensors, how many, on which components.
☐ GNSS receiver — which model, and confirm it matches the configuration described. (Given the SMC-ONE / SMC-TWO question outstanding across the range, ask this specifically.)
☐ Antennas — how many, which model, mounting position.
☐ Display unit — model and mounting.
☐ Connection box, cabling and looms — machine-specific, often quoted separately.
☐ Mounting hardware — brackets specific to your machine.
Positioning
☐ Correction source — base station included, NTRIP subscription assumed, or excluded entirely?
☐ Base station hardware, if applicable.
☐ Radio infrastructure, if corrections go by radio.
☐ NTRIP subscription — cost, term, and who holds the account.
Services
☐ Installation labour — included or separate, and performed where.
☐ Machine downtime — how long, and does the machine need to travel?
☐ Machine calibration and commissioning — including the attachment library.
☐ Attachment configuration — how many buckets or blades are included? Additional ones usually cost extra.
☐ Site calibration, if this is your first 3D system.
☐ Verification standard — what check is performed and what documentation you receive.
☐ Operator training — hours, number of operators, location, follow-up session included or not.
Software and ongoing
☐ Licensing model — perpetual or subscription, and what happens if a subscription lapses.
☐ Software updates — included, and how delivered.
☐ Support agreement — coverage, response commitment, term.
☐ Warranty — duration, coverage, what voids it.
☐ Loan equipment — available during repair, and at what cost.
Upgrades
☐ Documented upgrade path from your tier to the next — component list and current pricing.
☐ Labour and downtime for an upgrade.
☐ Recalibration after an upgrade — included?
Get this at purchase, not when you want it. The scalability of the platform is only worth something if the path is priced and documented.
The usual exclusions
Machine downtime. Never in the quote, always a real cost.
Additional attachments. Configuration covers the buckets you specified.
Design data preparation. A 3D system needs usable models. Producing them is work, rarely in a hardware quote.
Additional operator training. Turnover means you will train more people than the quote covers.
Recalibration after repair, component change or time in service.
Damage repair. Not warranty.
Travel for site support. Particularly outside metro areas — confirm whether it’s charged and how calculated.
Data connectivity. Where NTRIP or telemetry is used.
Four questions that reveal the gaps
“What will I need to buy in the first twelve months that isn’t on this quote?”
“If this goes down on a remote site, what does getting it running again cost me?”
“What do years two and three cost, assuming nothing breaks?”
“If I add a machine in six months, what does that quote look like?”
An evasive answer to the first is itself the answer.
On comparing
The lowest quote with the fewest inclusions is not a saving — it’s a deferral. Line quotes up against this checklist on the same scope. Usually the apparent gap largely closes, and what remains is a difference in support, which is a legitimate thing to pay for.
CTA: Red Edge Resources will quote against this checklist, exclusions included. Ask for it in writing.
Pre-publish flags: None — this article deliberately contains no prices.