Stonex drill rig guidance provides a retrofit GNSS machine-guidance solution for positioning mining and blast-hole drill rigs from digital drill designs, helping operators navigate directly to planned hole locations using high-accuracy RTK positioning.
Mining drill patterns can contain hundreds or thousands of individual holes.
Getting the drill rig to those positions traditionally requires significant coordination between engineering, survey and production teams.
Surveyors establish the designed hole positions in the field. Drill operators locate those marks, position the machine and complete the drilling program.
Stonex drill rig guidance provides another approach.
By bringing GNSS positioning, machine guidance and digital design information into the cab, a drill rig can be guided directly toward planned hole locations.
For contractors with existing equipment, one of the major attractions is the ability to consider retrofitting machine guidance rather than replacing the drill rig simply to gain positioning technology.
What Is Stonex Drill Rig Guidance?
Stonex drill rig guidance applies GNSS machine-control technology to drilling applications.
The fundamental principle is straightforward.
The system needs to determine:
- Where the drill rig is
- Which direction the machine is oriented
- Where the relevant drilling point is relative to the positioning hardware
- Where the design requires the hole to be
The guidance system compares the machine position with the digital drill design and presents guidance information to the operator.
Instead of relying solely on physical survey marks, the operator can navigate toward the planned hole using the machine display.
How Does Stonex Drill Rig Guidance Work?
A drill guidance installation brings together several technologies.
At a high level, the workflow is:
Digital Drill Design → RTK GNSS Position → Machine Geometry → Operator Guidance → Designed Hole
Each part of that workflow matters.
High-quality GNSS alone does not create a complete drill guidance system.
The system also needs correct machine measurements, suitable installation, correct project coordinates and accurate digital design information.
RTK GNSS Provides the Machine Position
The first requirement is accurate positioning.
Standard standalone GNSS is generally not sufficient for precision drill rig guidance.
RTK corrections are used to improve the positioning solution.
Depending on the site and system configuration, corrections may be provided through:
- A local GNSS base station
- Existing mine-site RTK infrastructure
- UHF radio
- NTRIP
- A compatible correction network
The appropriate correction method depends on the mine infrastructure, coverage and compatibility requirements.
Once suitable corrections are received, the machine guidance system has a high-accuracy GNSS position to work from.
Machine Heading Is Also Important
Knowing the coordinates of a GNSS antenna doesn’t necessarily tell the system everything it needs to know about the machine.
The guidance system also needs to understand machine orientation.
This is particularly important because the drilling point is physically offset from the GNSS equipment.
Depending on the Stonex system configuration, heading and orientation information may be derived using the installed GNSS and sensor architecture.
The objective is to give the guidance software sufficient information to calculate where the drill point is relative to the design.
From GNSS Antenna to Drill Point
This is where machine calibration becomes critical.
The GNSS antennas are mounted at known locations on the drill rig.
But those antenna positions are not necessarily the position where drilling occurs.
The system therefore needs measurements defining the relationship between the GNSS equipment and the relevant machine geometry.
In simplified terms, the guidance system is continually calculating:
“I know where the positioning hardware is. Based on the machine calibration, where is the drilling point?”
If those measurements are incorrect, the calculated drill position can also be incorrect.
That remains true even if the GNSS receiver itself is showing RTK Fixed.
Digital Drill Designs Replace the Search for Pegs
The second major part of Stonex drill rig guidance is the digital design.
The planned drill-hole locations are made available to the machine guidance system.
The operator can then see the drill pattern relative to the machine.
Instead of navigating from physical peg to physical peg, the operator can use the display to identify the next planned hole and move the machine toward it.
This creates a much more direct connection between the project design and the production machine.
The Traditional Drill Set-Out Workflow
A conventional workflow may look something like this:
Engineering Design
↓
Survey receives drill pattern
↓
Surveyor physically sets out hole positions
↓
Drill crew identifies the marks
↓
Drill rig positions over each mark
↓
Drilling begins
This process works, but large drill programs can create substantial repetitive survey requirements.
Physical marks also exist within an active mining environment where they can potentially be disturbed.
The GNSS-Guided Workflow
With a suitable Stonex drill rig guidance system, the workflow can move toward:
Engineering Design
↓
Digital Drill Pattern
↓
Machine Guidance System
↓
Operator navigates to designed hole
↓
Position verified
↓
Drilling begins
Survey remains important.
The change is in how much of the routine physical positioning process needs to happen through individual field marks.
Reducing Reliance on Physical Drill-Hole Set-Out
This is one of the strongest commercial reasons to consider drill rig guidance.
Imagine a blast pattern containing 500 holes.
Those positions need to be communicated accurately to the drilling operation.
Scale that across repeated blasts and the number of individual set-out points can become substantial.
With digital machine guidance, the drill operator can navigate directly toward design positions.
Survey resources can then be focused more heavily on areas such as:
- Project control
- Verification
- Quality assurance
- Design checks
- Independent machine checks
- As-built requirements
This doesn’t eliminate survey.
It changes the workflow between survey and production.
What Happens When Drill Pegs Are Lost?
Physical set-out marks can be affected by normal mining activity.
They may be:
- Driven over
- Covered
- Damaged
- Disturbed
- Difficult to identify
- Removed during preparation
When the primary drill reference is a digital design tied to a correctly established GNSS positioning framework, the machine isn’t solely dependent on finding a physical peg.
That can be particularly valuable across large and active drill areas.
Stonex Drill Rig Guidance for Blast-Hole Drilling
Blast-hole drilling is a natural application for GNSS machine guidance.
The drill pattern already exists as a design.
The challenge is transferring those planned positions accurately and efficiently to the drill rig.
Stonex drill rig guidance can provide the operator with a digital representation of the planned hole locations and machine position.
The operator can navigate between holes using the guidance interface rather than relying exclusively on physical set-out.
This can support a more digital drill-and-blast workflow.
Retrofit Guidance for Existing Mining Drill Rigs
One of the strongest applications for aftermarket machine guidance is existing equipment.
Mining contractors may have perfectly serviceable drill rigs that do not have the required factory-installed guidance technology.
Replacing the entire machine to gain digital positioning may not be commercially attractive.
A retrofit approach allows the existing drill rig to be assessed for installation of suitable:
- GNSS equipment
- Antennas
- Sensors where required
- Machine controller
- Operator display
- Cabling and power hardware
The exact configuration depends on the machine.
Mixed Drill Rig Fleets
Many contractors don’t operate a fleet consisting of identical machines.
They may have:
- Different drill manufacturers
- Different machine models
- Different ages
- Different electrical architectures
- Different mast arrangements
This is where an aftermarket guidance strategy can be particularly useful.
Rather than relying entirely on an individual machine manufacturer’s technology ecosystem, contractors can investigate whether a common guidance approach can be applied across suitable machines within the fleet.
Each machine still needs to be individually assessed, installed, calibrated and verified.
What Needs to Be Assessed Before a Retrofit?
A drill rig should be inspected before selecting the final system configuration.
Important considerations include:
GNSS Antenna Locations
The antennas require suitable satellite visibility and mechanically stable mounting positions.
Machine Geometry
The relationship between the GNSS hardware and drilling point needs to be established.
Machine Movement
The installation needs to account for the parts of the drill rig that move during normal operation.
Sensor Requirements
Depending on the guidance architecture and machine, additional sensors may be required.
Display Location
The operator needs to see and use the guidance display without unnecessarily obstructing existing controls or visibility.
Power Supply
Suitable machine power and electrical protection need to be considered.
Cable Routing
Drill rigs are harsh environments for electrical cables.
Routing needs to account for vibration, movement, heat, abrasion and potential physical damage.
RTK Corrections
The machine needs a correction method compatible with the site’s infrastructure and system configuration.
UHF Radio Corrections on Mine Sites
Many mining operations use local GNSS base stations transmitting RTK corrections over UHF radio.
For a retrofit drill rig, it is not enough to know that the site “has a GPS base.”
Compatibility needs to be established.
Important information can include:
- Correction format
- Radio protocol
- Frequency
- Channel spacing
- Baud/data settings
- FEC requirements where applicable
- Base station configuration
Two systems can both be described as supporting RTK and still not necessarily communicate over the same radio configuration.
This should be confirmed before mobilisation.
NTRIP Corrections for Drill Rig Guidance
Where reliable communications infrastructure exists, RTK corrections may also be delivered using NTRIP.
This can reduce reliance on a dedicated UHF radio link.
However, the suitability of NTRIP depends on site connectivity.
Mining drill rigs may operate in areas where cellular or network coverage is limited.
Correction strategy should therefore be designed around the actual site rather than assuming one method is always superior.
Stonex Drill Rig Guidance and RTK Fixed
RTK Fixed is important.
But it should not be treated as a complete accuracy check.
A machine can potentially have a valid fixed GNSS solution while the calculated drill point remains incorrect because of another issue.
Possible causes include:
- Incorrect machine measurements
- Incorrect antenna offsets
- Antenna movement
- Incorrect project coordinates
- Localisation errors
- Wrong design
- Sensor calibration errors
- Mechanical changes
The machine needs to be treated as a complete positioning system.
Why Machine Calibration Matters
Consider a GNSS antenna installed one metre from the actual reference point required for guidance.
If the system knows that offset correctly, it can account for it.
If the entered measurement is wrong by 50 mm, that error can affect the calculated guidance position.
This is why careful measure-up and calibration are fundamental to the installation.
High-accuracy GNSS cannot compensate for incorrect machine geometry entered into the guidance system.
Independent Accuracy Verification
After installation and commissioning, the guidance result should be checked independently.
This establishes whether the calculated machine position agrees with a known survey reference.
A suitable verification process should also be considered following changes such as:
- GNSS antenna replacement
- Antenna movement
- Sensor replacement
- Structural repairs
- Relevant mechanical modifications
- System recalibration
- Major configuration changes
The purpose is to verify the complete machine rather than simply checking that GNSS is Fixed.
Daily Operator Checks
A production system also needs routine checks.
The exact site procedure will vary, but operators and technical personnel should be alert to changes in:
- GNSS status
- Correction reception
- Antenna mounting
- Sensor condition
- Cable condition
- Display warnings
- Guidance behaviour
If the machine position suddenly disagrees with known site information, the discrepancy should be investigated rather than simply continuing because RTK remains Fixed.
Environmental Conditions Matter
Drill rigs are demanding environments for electronic equipment.
A machine-guidance installation may be exposed to:
- Constant vibration
- Dust
- Mud
- Heat
- Rain
- Wash-down
- Hydraulic systems
- Moving machine structures
Component selection is only part of the solution.
Installation quality is equally important.
Brackets, cable protection, connectors, mounting locations and serviceability all influence long-term reliability.
Designing for Maintenance
Mining equipment eventually requires repair.
A good machine-guidance installation should consider what happens when the machine is serviced.
Technicians may need to remove:
- Panels
- Mast components
- Cab components
- Guards
- Electrical equipment
Cables and sensors should be installed so that normal machine maintenance doesn’t unnecessarily damage the guidance system.
Likewise, guidance components should remain accessible for inspection and replacement.
GNSS Drill Guidance Can Improve Workflow, Not Just Position
It is easy to view drill guidance simply as a replacement for a peg.
The broader opportunity is workflow improvement.
A digital system connects:
Engineering → Survey → Digital Design → Machine → Operator
This can reduce the number of manual steps required to transfer a planned position from the office to the drill rig.
For large drilling programs, improving this workflow can be commercially significant.
Potential Benefits for Mining Contractors
The business case for Stonex drill rig guidance can include several areas.
Reduced Physical Set-Out Requirements
Operators can navigate toward digital hole locations rather than relying exclusively on individually marked positions.
Faster Hole Navigation
The next target is visible within the guidance environment.
Reduced Impact of Lost Pegs
Digital positions aren’t physically driven over or buried.
Better Design Visibility
The operator can see the planned drilling information in the machine.
Retrofit Existing Assets
Suitable existing drill rigs can potentially be upgraded without replacing the entire machine.
Fleet Standardisation
A common aftermarket guidance approach may be considered across suitable machines from different manufacturers.
The actual commercial benefit depends on the project, fleet and existing workflow.
Stonex Drill Guidance for Mining Contractors
For a contractor, machine guidance needs to work beyond a single demonstration machine.
The system needs to be:
- Installable
- Calibratable
- Verifiable
- Supportable
- Repairable
- Compatible with the intended site infrastructure
This is particularly important for contractors moving machines between projects.
A drill rig may operate on one site using a local UHF base and then mobilise to another project with different correction infrastructure.
Understanding these requirements before mobilisation can prevent substantial downtime.
The Importance of Local Technical Support
Machine guidance sits between several technical disciplines.
A problem can originate from:
- GNSS
- Radio communications
- Survey
- Coordinate systems
- Machine calibration
- Sensors
- Electrical installation
- Design data
- Software
Effective support therefore requires more than knowing how to replace a GNSS receiver.
The technician needs to determine which part of the positioning chain is actually creating the error.
This is particularly important when a drill rig is production-critical.
Red Edge Resources and Stonex Drill Rig Guidance
Red Edge Resources provides Stonex machine-guidance solutions and technical support for mining and heavy-equipment applications in Australia.
For drill rig projects, the approach should begin with the machine and site requirements.
That includes understanding:
- Drill rig make and model
- Existing machine systems
- Required guidance functionality
- Drill design workflow
- Site coordinate system
- RTK correction infrastructure
- Radio/network compatibility
- Required installation
- Commissioning
- Accuracy verification
- Operator and technical support
From there, an appropriate Stonex configuration can be developed for the application.
Planning a Stonex Drill Rig Guidance Retrofit
Before requesting a system, it is useful to collect:
- Drill rig manufacturer
- Machine model
- Machine year
- Photos of the machine and mast
- Existing GNSS or guidance equipment
- Site correction method
- Base station or network information
- Required drilling workflow
- Design-file requirements
- Project accuracy requirements
This gives the system provider a much better foundation for assessing the application.
Is Stonex Drill Rig Guidance Worth Considering?
For contractors operating suitable existing drill rigs, Stonex drill rig guidance provides an option for moving toward a digitally guided drilling workflow without making the guidance technology dependent solely on purchasing a new OEM machine.
The strongest applications are likely to be projects where there are:
- Large numbers of designed holes
- Significant physical survey set-out requirements
- Repeated drilling patterns
- Existing drill rigs worth retaining
- Mixed equipment fleets
- A requirement for digital machine positioning
The technology should still be engineered, installed, calibrated and verified correctly.
The real value isn’t simply knowing where a GNSS antenna is.
It is accurately connecting the digital drill design to the drilling point on the machine.
That is what turns GNSS positioning into machine guidance.
Frequently Asked Questions About Stonex Drill Rig Guidance
What is Stonex drill rig guidance?
Stonex drill rig guidance applies GNSS machine-guidance technology to drilling applications, allowing a suitable machine configuration to be positioned relative to digitally designed drill locations.
Can Stonex drill guidance be retrofitted?
A retrofit installation may be possible on suitable existing drill rigs. The machine needs to be assessed for GNSS mounting, geometry, sensors, display, electrical and installation requirements.
Can Stonex guidance be used for blast-hole drilling?
Blast-hole drilling is an application where GNSS machine guidance can be used to navigate a drill rig relative to digitally planned hole locations.
Does Stonex drill guidance eliminate survey set-out?
It can reduce reliance on physical hole set-out. Survey remains important for project control, coordinate setup, verification and quality assurance.
Does the drill rig need RTK corrections?
Precision GNSS machine guidance normally requires suitable correction information. The correction source and delivery method depend on the system and site infrastructure.
Can Stonex drill rigs use a mine site’s GNSS base?
Potentially, but compatibility needs to be confirmed. Correction format and radio settings can affect whether the machine can actually receive and use the site’s corrections.
Does RTK Fixed guarantee the drill hole is in the correct position?
No. RTK Fixed relates to the GNSS solution. Overall machine accuracy also depends on calibration, antenna positions, machine geometry, coordinate systems, design data and other factors.
Can Stonex be used across different drill rig brands?
Aftermarket guidance can potentially provide a path for mixed fleets, but each machine needs to be individually assessed for installation and compatibility.