Why proposals fail Machine control proposals usually fail for one of two reasons. The first is that they arrive as a technology argument — capability, features, what competitors are running. Finance does not assess capability. It assesses capital deployment against return. The second is that they arrive with vendor productivity percentages. An experienced finance manager discounts a supplier-sourced figure to approximately zero, and reasonably so. Worse, using an unsubstantiated figure damages the credibility of the numbers you can defend. Build the case on your own data. Step 1: Establish the current cost You need a baseline, and it will not exist in your accounts because these costs are absorbed rather than tracked. Pick one recent, representative job and reconstruct: Rework events. Every time a machine returned to completed work. Count them, estimate hours, cost at plant rate. Material variance. Actual volumes moved versus design volumes. Less genuine variation, the gap is over-excavation and rework. Imported fill. Volume purchased against volume the design required. Survey. Set-out and reactive call-outs, at rate or subcontract cost. Grade-checking labour. Estimated hours per shift across the crew, at labour rate. Standing time. Machines idle waiting for checks, set-out or survey. This will take a day of someone’s time and it is the most valuable day in the whole exercise. It converts the argument from a claim into an observation about your own business. Step 2: Estimate the addressable portion Not all of that cost is recoverable. Be conservative, deliberately and visibly. Go through each category and estimate what proportion guidance realistically addresses, then discount it. If you think rework drops by half, model a third. A case that survives conservative assumptions is a case that survives scrutiny — and it is a case you can still meet after approval. Step 3: Build the full cost side Not the quote. The total cost of ownership: acquisition, installation, commissioning, training, machine downtime, recurring licensing and support, data management time, and an allowance for damage and repair over the period. Include the awkward items. A proposal that has obviously thought about ongoing costs reads as credible. One showing only the purchase price reads as optimistic, and invites the reviewer to find the omissions themselves. Step 4: Model over a realistic life One-year payback calculations invite scepticism. Model over the realistic service life, showing: Year-by-year cost Year-by-year benefit, with a deliberately slow ramp in year one for the learning period Cumulative position Payback point Net position at end of life The slow ramp matters. It shows you have accounted for the adjustment period rather than assuming full benefit from day one, and it prevents an awkward conversation at the first quarterly review. Step 5: Include the non-financial case, separately Safety and quality belong in the proposal, in their own section, not smuggled into the financial model. For safety, use the accurate framing: guidance reduces the number of occasions people need to be on foot around working plant, through fewer manual grade checks and fewer survey interruptions. Do not describe it as a safety system — it is not a personnel-detection system, and an overstated safety claim in a board paper is a liability. For quality: reduced rework, better conformance, and less variation between operators. Step 6: Propose a stage, not a fleet Ask for what you need to prove it. Two or three machines, a defined measurement period, defined success criteria, and a commitment to return with results. That is a much smaller decision, it is far easier to approve, and it puts you in the strongest possible position for the expansion request — you will be presenting your own measured results rather than anyone’s projections. What makes it credible Conservative assumptions. Your own data. Explicit acknowledgement of costs and risks. A staged ask. No vendor percentages. A proposal built that way tends to get approved, because it reads like an operational argument rather than a purchase someone has already decided on. CTA: Red Edge Resources can provide the cost side of the model in detail. The operational baseline has to come from your jobs — we can help you work out what to measure. Pre-publish flags: None. Do not add vendor productivity statistics to this article — the argument it makes depends on not having any.
https://rededgeresources.com.au/wp-content/uploads/2024/09/red-edge-resources-logo-black-300x138.webp00[email protected]https://rededgeresources.com.au/wp-content/uploads/2024/09/red-edge-resources-logo-black-300x138.webp[email protected]2026-09-01 10:12:282026-09-01 10:12:35Building a Machine Control Business Case