In-Field Design on the Machine

The gap it fills
A 3D machine control system needs a design model. On plenty of jobs, there isn’t one.
Small jobs never had a model. Variations arise on site with no time to go back to the designer. Sometimes the design exists on paper but not in a usable digital form. Sometimes the work is genuinely simple and modelling it would be disproportionate.
Without in-field design, those jobs run unguided — which means an expensive system sitting idle on exactly the work where it would have helped.
What it does
GradeMetrix supports in-field design, allowing flat pads and single, dual or multiple slopes to be built on the fly. \[MFR]
The operator defines the design at the machine: set a reference, define the slopes, and work to it.
Where it covers the job completely
Flat pads. Building platforms, hardstands, floors. Set the level, work to it.
Single slope. Anything with fall in one direction — a drainage run, a graded surface, a simple batter.
Dual slope. Fall in two directions. A pad with crossfall, a shaped platform.
Multiple slopes. More complex arrangements built from slope elements.
Between them, that covers a considerable amount of everyday work. A great deal of what gets built is describable as a level and some slopes.
The combination that matters
In-field design and 2.5D together are what make the platform practical on unprepared jobs.
2.5D removes the need for site control and localisation. In-field design removes the need for a design model.
Together they mean a machine can arrive at a job with no site control, no localisation and no digital model, and do accurate guided work that day.
For contractors doing varied short-duration work — which describes a lot of civil and plant hire businesses — that is the difference between a system that gets used and one that gets used occasionally.
Where it doesn’t cover the job
Be clear about the ceiling.
Complex surfaces. A design with varying grades, transitions, crowns and curves is not expressible as pads and slopes. You need a model.
Design-critical work. Where the design has been engineered and must be built exactly as designed, someone building it in the cab is not the right process.
Work tied to project coordinates. In-field design defines a shape, not a position in a project grid.
Anything requiring a documented design basis. If you need to demonstrate what you built to, an in-field design is a weaker record than an issued model.
The practical cautions
Someone is designing on the machine. That means the accuracy of the outcome depends on the operator’s understanding of what is required. Make sure whoever is setting up in-field designs knows what they’re building to.
Record what was built. An in-field design that exists only in the machine is not an as-built record. If the work needs documenting, document it separately.
Check the reference. An in-field design is built from a reference the operator establishes. If that reference is wrong, the whole design is offset — accurately.
Don’t use it to avoid a model that should exist. On design-critical work, building in the cab because the model wasn’t ready is a shortcut with real consequences.
The training point
In-field design is a distinct skill from operating guided to a supplied model. It should be covered explicitly in operator training rather than assumed — including when it’s appropriate to use and when to ask for a model instead.