Stonex for Construction and Infrastructure

One job, several requirements
A typical civil project is not one machine control problem. Bulk earthworks, drainage, pad formation, road construction and utilities each have different accuracy demands and different design complexity.
Red Edge supplies Stonex machine control across construction and infrastructure work. Mapping the tiers against the activities helps avoid both over-buying and under-buying.
Bulk earthworks
Large volumes, design surfaces that vary across the site, multiple machines working to a common target.
Fit: 3D Pro with site infrastructure. The design in the cab, machines and rovers on a consistent datum, minimal set-out.
Payoff: reduced rework and over-excavation, less material moved twice, and a shorter trim and correction phase at the end.
Drainage and utilities
Invert levels, consistent fall, tie-ins to existing services.
Fit: 1D or 2D for most runs; 2D½ where correction access already exists; 3D Pro where drainage is part of a wider model.
Payoff: nobody in the trench for routine checking, reduced bedding material from eliminated overcut, and an offsider freed up.
Pad and platform formation
Building pads, commercial slabs, hardstands.
Fit: 2D where the pad is a consistent surface at constant fall; 3D Pro where it varies or ties to a site model.
Payoff: first-pass accuracy, fewer correction passes, consistent finished level across the area.
Road formation
Subgrade, pavement layers, crossfall and transitions.
Fit: 3D Pro. Crossfall changes and superelevation transitions through curves are difficult to execute accurately by eye and demand dense set-out without a model.
Payoff: the material argument. If subgrade is consistently low by even a small margin, every square metre of pavement above it is thicker than designed. Across a road project that is a large volume of expensive material placed for no benefit.
Structures and tie-ins
Working to existing levels — connecting to a live main, matching an existing pavement, tying into an adjacent structure.
Fit: any tier, referenced appropriately to a surveyed point on the existing feature.
Note: guidance does not locate services. Service location procedures apply exactly as before.
The urban complication
Construction work in built-up areas presents a GNSS problem worth planning for. Adjacent buildings block sky view and cause multipath from reflective surfaces.
Multi-constellation support helps materially — more satellites to draw from when the visible sky is restricted. But a constrained urban site is genuinely harder than an open one, and it is worth testing performance on the actual site rather than assuming.
Where GNSS is marginal, the lower tiers working from local references may be more reliable than a 3D solution struggling for a fix. That is not a downgrade; it is choosing the tool that works.
The mixed fleet argument
Civil contractors run mixed fleets — excavators of several brands, a dozer or two, sometimes a loader.
Stonex’s platform approach means one software environment across excavators, dozers and loaders. Practically: one training programme, one support relationship, one spares holding, operators who can move between machines without relearning.
Against a fleet where each machine carries whatever guidance came with it, that consistency is a recurring saving that never appears on a quote.
Starting sensibly
For a contractor new to machine control, the pattern that works:
Fit the highest-utilisation machine on guidance-relevant work
Choose the tier the current work needs, not the flagship
Measure something — rework events, survey call-outs, material against design
Expand on measured results, with an internal champion already developed
The scalability of the platform means starting lower is not a dead end.