Stonex STX-Dig 3D Excavator Machine Control System: Precision Excavation for Australian Contractors

Transforming Excavator Operations with Advanced 3D Guidance Technology

The Stonex STX-Dig 3D excavator machine control system represents a breakthrough in precision excavation technology for Australian civil construction and mining contractors. As a key component of Red Edge Resources’ comprehensive machine guidance solutions, the STX-Dig system delivers real-time 3D guidance, intuitive operation, and exceptional accuracy that transforms how excavators work on modern construction sites.

Whether you’re excavating foundations, installing utilities, constructing drainage systems, or performing final grade work, the Stonex STX-Dig system provides the precision and efficiency that Australian contractors need to stay competitive, reduce costs, and deliver superior results.

Understanding 3D Excavator Machine Control

What Is 3D Machine Control?

Three-dimensional machine control systems use GNSS (Global Navigation Satellite System) positioning and advanced sensors to provide real-time guidance for excavator operations:

Core Components:

  • GNSS receivers – Track precise machine position using satellite signals
  • Tilt and rotation sensors – Monitor boom, stick, and bucket angles
  • In-cab display – Shows real-time cut/fill information and design surfaces
  • Control box – Processes sensor data and calculates bucket position
  • Design files – Digital 3D models guide excavation to exact specifications

Real-Time Guidance:

  • Displays bucket cutting edge position relative to design surface
  • Shows cut/fill depth in real-time
  • Provides visual and numerical guidance
  • Eliminates need for grade stakes and constant checking
  • Enables single-operator precision excavation

Accuracy Performance:

  • Typical accuracy: ±20-30mm vertical
  • Optimal conditions: ±15mm vertical achievable
  • Horizontal positioning: ±30-40mm typical
  • Real-time updates: Continuous position calculation

Traditional Excavation vs 3D Machine Control

Traditional Methods:

  • Extensive survey staking required
  • Frequent grade checking with laser or level
  • Multiple site visits from surveyors
  • Reliance on operator experience and estimation
  • High risk of over-excavation or under-excavation
  • Constant communication with ground personnel

STX-Dig 3D System:

  • Digital design files replace physical stakes
  • Continuous real-time grade information
  • Minimal surveyor involvement during excavation
  • Precise guidance regardless of operator experience
  • Accurate first-pass excavation
  • Safer operation with fewer ground personnel

Stonex STX-Dig System Components

In-Cab Display Unit

The STX-Dig features an intuitive touchscreen display designed for excavator environments:

Display Specifications:

  • Screen size: 10.1-inch high-resolution touchscreen
  • Brightness: 800+ cd/m² for sunlight visibility
  • Resolution: 1280×800 pixels for clear graphics
  • Touch interface: Glove-compatible capacitive touchscreen
  • Mounting: Adjustable bracket for optimal viewing position
  • Environmental rating: IP65 dust and water protection

Display Features:

  • 3D bucket view – Real-time visualisation of bucket position
  • Cut/fill indicators – Colour-coded depth information
  • Cross-section view – Shows design profile and current position
  • Plan view – Overhead map with design elements
  • Numerical readouts – Precise cut/fill measurements
  • Design surface display – Visual representation of target grade

Operator Interface:

  • Intuitive menu navigation
  • Quick access to common functions
  • Customisable display layouts
  • Multiple view options simultaneously
  • Simple job file selection
  • Easy offset adjustments

GNSS Positioning System

Precise satellite positioning forms the foundation of the STX-Dig system:

GNSS Receivers:

  • Dual GNSS antennas – Mounted on excavator cab and boom
  • Multi-constellation support – GPS, GLONASS, Galileo, BeiDou
  • RTK correction capability – Centimetre-level positioning accuracy
  • Update rate – 10-20Hz for smooth, responsive guidance
  • Communication – Radio or cellular RTK corrections

Positioning Accuracy:

  • RTK fixed mode: ±10-15mm + 1ppm horizontal
  • RTK fixed mode: ±20-25mm + 1ppm vertical
  • RTK float mode: ±100-300mm (backup mode)
  • Initialisation time: <10 seconds typical

RTK Correction Sources:

  • Red Edge base station (Stonex S850 or similar)
  • Network RTK via cellular connection (CORSnet, GPSnet)
  • Radio base station (up to 8km range)
  • Hybrid configuration for maximum reliability

Sensor Package

Advanced sensors monitor excavator geometry and movement:

Inertial Measurement Unit (IMU):

  • Dual-axis tilt sensors – Monitor machine and boom angles
  • Rotation sensors – Track slew position and orientation
  • Accelerometers – Detect dynamic movement
  • Update rate – High-frequency sampling for smooth operation
  • Calibration – Automatic compensation for sensor drift

Boom, Stick, and Bucket Sensors:

  • Rotary encoders – Measure joint angles precisely
  • Redundant sensing – Multiple measurement methods for reliability
  • Sealed construction – Protected from dust, water, and impact
  • Heavy-duty cables – Abrasion-resistant and flexible
  • Quick-connect fittings – Simplified installation and maintenance

Machine Geometry Measurement:

  • Boom length and pivot point location
  • Stick length and attachment point
  • Bucket dimensions and cutting edge position
  • Machine centre of rotation
  • GNSS antenna positions relative to machine

Control Box and Processing Unit

The system brain processes all sensor data and manages communications:

Processing Capabilities:

  • High-speed processor – Real-time position calculations
  • Multi-tasking operation – Simultaneous data processing
  • Design file management – Handle complex 3D surfaces
  • Coordinate transformations – Support multiple coordinate systems
  • Data logging – Record excavation progress and as-built data

Connectivity:

  • CAN bus integration – Connect to machine systems
  • Bluetooth – Wireless display connection option
  • USB ports – File transfer and configuration
  • Serial communications – Legacy equipment compatibility
  • Ethernet – Network connectivity for updates

Environmental Protection:

  • IP67 rating – Dust-tight and waterproof
  • Vibration resistant – Withstands excavator operation
  • Temperature range – -30°C to +70°C operation
  • Shock protection – Rugged mounting and construction
  • EMI shielding – Protection from electrical interference

STX-Dig System Capabilities

3D Design Surface Guidance

The core functionality that transforms excavator productivity:

Design File Support:

  • File formats: .dxf, .dwg, .xml, .csv, .ttm, .svd
  • Surface types: TIN surfaces, DTM models, alignments
  • Multiple surfaces: Switch between design layers instantly
  • Complex geometry: Handle intricate 3D designs
  • Large files: Process extensive site models efficiently

Real-Time Cut/Fill Display:

  • Colour-coded indicators:
    • Red zone – Cut required (above design grade)
    • Blue zone – Fill required (below design grade)
    • Green zone – On grade (within tolerance)
  • Numerical depth display – Precise measurements in millimetres
  • Tolerance bands – Configurable for finish vs rough excavation
  • Audio alerts – Optional sound notifications for grade achievement

Visual Guidance Modes:

  • Bucket view – 3D representation of bucket relative to design
  • Cross-section – Side view showing design profile
  • Plan view – Overhead map with position indicator
  • Slope guidance – Visual indicators for batter excavation
  • Multi-view display – Multiple perspectives simultaneously

Offset and Elevation Functions

Critical features for versatile excavation work:

Offset Functionality:

  • Purpose: Adjust zero-reference point relative to bucket cutting edge
  • Applications:
    • Excavating to formation level
    • Working to pipe invert elevations
    • Adjusting for different bucket sizes
    • Compensating for wear on cutting edges
  • Input methods:
    • Manual numerical entry
    • Reference delta from known point
    • Quick preset values
  • Display integration: Offset value visible on work screen
  • Real-time adjustment: Change offsets without stopping work

Elevation Level Control:

  • Z-value adjustment – Modify reference elevation via GNSS
  • Save and reset functions – Store multiple reference levels
  • Bucket position display – Shows adjusted elevation in real-time
  • Design surface shifting – Effectively raise or lower entire design
  • Quick access – Easily toggle between reference levels

Practical Applications:

  • Setting formation level for pipe bedding
  • Adjusting for compacted base thickness
  • Compensating for different bucket configurations
  • Working to multiple grade levels on same project
  • Fine-tuning final grade elevations

Slope and Batter Excavation

Specialised guidance for angled excavation work:

Slope Indicators:

  • Visual slope guides – On-screen angle representations
  • Target slope display – Shows design batter angle
  • Current slope feedback – Real-time bucket angle monitoring
  • Tolerance zones – Acceptable slope variation indicators
  • Numerical readouts – Precise angle measurements

Batter Excavation Modes:

  • Fixed slope guidance – Maintain consistent batter angle
  • Variable slope – Follow changing design angles
  • Bench excavation – Multi-level slope construction
  • Compound slopes – Complex angular transitions
  • Vertical face – Guidance for straight vertical cuts

Applications:

  • Drainage channel construction
  • Retention basin excavation
  • Road embankment batters
  • Foundation wall excavation
  • Trench side slopes for safety

Grade Checking and Verification

Built-in quality control capabilities:

As-Built Data Collection:

  • Automatic logging – Record excavation progress continuously
  • Point collection – Capture specific verification points
  • Surface generation – Create as-built surface models
  • Volume calculations – Compare design vs actual excavation
  • Export capabilities – Transfer data to office software

Quality Assurance Features:

  • Tolerance monitoring – Alert when outside specifications
  • Over-excavation warnings – Prevent costly mistakes
  • Progress tracking – Visual indication of completed areas
  • Verification points – Check critical elevations during work
  • Documentation – Automated record-keeping for compliance

Applications for Australian Construction and Mining

Foundation Excavation

Precise excavation for building foundations and structures:

Residential Foundations:

  • House footings and slab excavation
  • Basement and undercroft excavation
  • Retaining wall foundations
  • Pier and pile cap excavation
  • Accurate depth control for engineering specifications

Commercial and Industrial:

  • Large building pad excavation
  • Multi-level basement construction
  • Column and foundation pier excavation
  • Equipment foundation pits
  • Precise elevation control for structural requirements

Benefits:

  • First-pass accuracy reduces rework
  • Minimal over-excavation saves concrete costs
  • Faster excavation with less checking
  • Reduced surveyor involvement
  • Improved safety with fewer ground personnel

Utility Installation and Trenching

Efficient and accurate utility trench excavation:

Sewer and Stormwater:

  • Precise invert level excavation
  • Consistent grade maintenance for gravity flow
  • Accurate depth control for cover requirements
  • Smooth trench bottom for pipe bedding
  • Reduced pipe bedding material requirements

Water and Gas Mains:

  • Depth compliance for service protection
  • Straight alignment for efficient installation
  • Consistent trench width
  • Accurate tie-in elevations at connections
  • Reduced risk of existing service damage

Electrical and Communications:

  • Conduit trench excavation to specification
  • Multiple service trenches with precise separation
  • Accurate depth for cable protection
  • Smooth trench conditions for cable pulling
  • Reduced backfill and compaction requirements

Advantages:

  • 30-50% faster trenching operations
  • Reduced material waste and costs
  • Improved pipe laying efficiency
  • Better quality control and compliance
  • Safer operations with precise depth control

Road and Civil Construction

Essential applications for infrastructure projects:

Road Construction:

  • Subgrade excavation to design profile
  • Drainage channel and table drain construction
  • Culvert and cross-drain excavation
  • Intersection and roundabout formation
  • Median and verge shaping

Subdivision Development:

  • Lot pad preparation and levelling
  • Street formation excavation
  • Drainage system installation
  • Retention basin construction
  • Service trench excavation

Bulk Earthworks:

  • Cut to fill operations with precise control
  • Batter and slope excavation
  • Drainage and erosion control features
  • Site preparation and levelling
  • Material quantity management

Project Benefits:

  • Faster project completion times
  • Reduced survey staking costs
  • Improved grade accuracy and quality
  • Lower material and rework costs
  • Enhanced project profitability

Mining Applications

Rugged performance for demanding mining environments:

Mine Development:

  • Haul road construction and maintenance
  • Drainage system excavation
  • Infrastructure foundation excavation
  • Service trench installation
  • Precise grade control for operational efficiency

Production Support:

  • Ramp and access road construction
  • Sump and water management excavation
  • Equipment foundation preparation
  • Precise excavation for blasting operations
  • Grade control for ore handling

Rehabilitation:

  • Final landform construction
  • Drainage feature creation
  • Topsoil placement preparation
  • Erosion control structure excavation
  • Compliance with rehabilitation plans

Mining Advantages:

  • Operate in remote locations with base station
  • Reduced surveyor site visits
  • Improved safety with precise depth control
  • Better material management and cost control
  • Enhanced compliance documentation

Landscaping and Final Grade Work

Precision finishing for aesthetic and functional requirements:

Commercial Landscaping:

  • Precise pad and terrace excavation
  • Drainage swale and feature construction
  • Retention pond and water feature excavation
  • Accurate grade for irrigation and drainage
  • Smooth finish for turf and planting areas

Sports Field Construction:

  • Precise grade control for drainage
  • Consistent surface elevation
  • Subgrade preparation for turf systems
  • Drainage system installation
  • Quality control for performance specifications

Golf Course Construction:

  • Green and tee box excavation
  • Fairway shaping and contouring
  • Bunker excavation to design
  • Drainage feature construction
  • Precise elevation control for playability

Red Edge Resources Installation and Training

STX-Dig Installation Masterclass

Comprehensive training programme for independent installation capability:

Course Structure:

  • Self-paced online modules – Learn at your convenience
  • Video demonstrations – Visual step-by-step instructions
  • Downloadable resources – Reference materials and checklists
  • Knowledge quizzes – Test understanding of key concepts
  • Certification – Recognised installer credential upon completion

Module Topics:

1. System Introduction and Overview:

  • STX-Dig components and functionality
  • System capabilities and applications
  • Safety procedures and precautions
  • Tools and equipment requirements
  • Installation planning and preparation

2. Hardware Installation:

  • GNSS antenna mounting and positioning
  • Sensor installation on boom, stick, and bucket
  • Cable routing and protection
  • Display unit mounting and positioning
  • Control box installation and connections

3. Machine Measurement (Measure-Up):

  • Critical measurement points and procedures
  • Boom, stick, and bucket dimensions
  • Machine centre of rotation determination
  • GNSS antenna position measurement
  • Sensor configuration and verification

4. System Configuration:

  • Software setup and initialisation
  • Coordinate system configuration (MGA2020, local grids)
  • RTK correction source setup
  • Display customisation and preferences
  • Communication parameter configuration

5. Calibration and Testing:

  • GNSS calibration procedures
  • Sensor calibration and verification
  • System accuracy testing
  • Known point verification
  • Troubleshooting calibration issues

6. Design File Management:

  • Supported file formats and preparation
  • Loading design files to system
  • Surface selection and management
  • Design file verification
  • Job setup and configuration

7. Operator Training:

  • Display understanding and navigation
  • Cut/fill indicator interpretation
  • Offset and elevation functions
  • View mode selection and use
  • Best practices for accurate excavation

STX-Dig Operator Masterclass

Dedicated training for excavator operators using the system:

Operator-Focused Content:

  • Display understanding and interpretation
  • Real-time guidance utilisation
  • Offset and elevation level functions
  • Efficient excavation techniques with 3D guidance
  • Quality control and verification procedures
  • Troubleshooting common operational issues
  • Best practices for maximum productivity

Training Delivery:

  • Online self-paced learning modules
  • Practical field exercises and scenarios
  • Video demonstrations of real-world applications
  • Interactive quizzes and assessments
  • Certification upon successful completion