Which STX-DIG Tier Do You Need?
Start with the work
The most expensive machine control decision is buying a tier that does not match the work — in either direction.
Work through these questions in order.
Question 1: Do you need fall in more than one direction?
No — a single depth or level, side profile only → 1D is likely sufficient.
Yes — crossfall, compound slopes, shaped inverts → 2D minimum.
Most contractors overestimate here. Be honest about what the majority of your work actually requires, not the hardest job you did last year.
Question 2: Do you need to work against a design model?
No — you work to levels and slopes you establish on site → 1D, 2D or 2D½.
Yes — you work to a design surface, tied to a site datum, possibly shared across machines → 3D Pro.
This is the biggest step in the range, in capability and in overhead.
Question 3: Do you have a correction source?
Relevant if you have landed on 2D and are weighing 2D½.
Yes, RTK network access or a base station, with data coverage at machine level → 2D½ is attractive. Elevation from NTRIP, no laser.
No, and no plan to get one → 2D with a laser reference.
Question 4: Do you have usable design models and someone to manage them?
Only relevant if question 2 pointed to 3D Pro.
Yes → proceed with 3D Pro.
No → resolve this first. A 3D system without a data workflow is an expensive 2D system. This is worth pausing the purchase over.
Question 5: How is the work likely to change?
Because the platform is scalable, this is a lighter question than it would otherwise be. The relevant thing is not predicting three years out — it is confirming the upgrade path in writing for the configuration you are buying, so the option is real when you want it.
Typical matches
Owner-operator, drainage and general digging → 1D. Depth control, laser reference, low cost, quick to learn.
Civil contractor, mixed drainage and pad work → 2D. Double slopes, heading, works from local references.
Civil contractor with RTK already in place → 2D½. Same capability, laser removed.
Earthworks contractor on design-driven projects → 3D Pro. Full model in the cab.
Mining contractor, large sites → 3D Pro with site infrastructure.
Contractor testing the concept → 1D or 2D on the highest-utilisation machine, then expand on measured results.
The mistake to avoid in both directions
Buying too high is the common one. 3D Pro purchased because it is the flagship, then run as a 2D system because nobody owns the data workflow. Capital spent, capability unused, and the operator’s experience is of an over-complicated system.
Buying too low happens too. A contractor whose work is genuinely design-driven buying 2D to save money, then spending the difference on manual set-out every month.
The scalability of the platform means the first mistake is more common and the second is more recoverable. But both are avoidable by answering question 1 and question 2 honestly.
The question to ask your supplier
“Based on the work I’ve described, what’s the lowest tier that would do the job?”
A supplier who answers with a lower tier than you expected is giving you advice. One who confirms whatever you suggested is taking an order.
CTA: Describe your work to Red Edge Resources and ask for the lowest tier that covers it.
