Upgrading a Stonex Machine Control System

Why this matters more than it sounds
The usual machine control purchase locks in a capability level. Outgrow it and you replace the system, absorbing the whole cost again and putting operators through a new interface.
Stonex designs the STX-DIG platform around scalability instead: install at one level and add components to move up, rather than replacing what you have. [MFR]
For a contractor whose work is changing — or who simply does not want to bet on a forecast — that structure is the commercially interesting part of the platform.
What carries forward
Angle sensors. The sensors on boom, stick, bucket and frame are the foundation of every tier and stay in place.
STX-MC software. The same Android software runs across the range. Modules are added, but the operator is not learning a new system.
Operator familiarity. Underrated and worth real money. An upgrade that does not require retraining from scratch is an upgrade that gets used from day one.
Installation work. The mounting, cabling and machine integration already done.
What gets added at each step
1D → 2D: heading capability. Two passive antennas on the cabin roof and a dual-antenna GNSS receiver.
2D → 2D½: the NTRIP elevation module, plus access to a correction source. Removes the laser receiver and laser level.
2D → 3D Pro: GNSS positioning with corrections, design import capability, and the off-machine workflow to produce and georeference projects.
[VERIFY] — obtain the exact component list and current pricing for each upgrade step from Red Edge. This article is considerably more useful with real component lists, and it is the kind of specific, practical content that earns links and enquiries.
What to confirm before relying on it
Scalability is a design intention. Whether it holds for your specific installation depends on details, so get these answered before purchase:
Is my configuration upgradeable, specifically? Not the platform in general — the exact configuration being quoted.
What is the component cost of each step? In writing, current at time of quote.
What labour is involved? An upgrade requiring a full re-install is not much of an upgrade.
How much machine downtime? Costed at your plant rate, this can exceed the component cost.
Does recalibration follow? Almost certainly yes. Confirm who does it and whether it is included.
What are the software licensing implications? Do added modules carry licence costs, one-off or recurring?
Note also that third-party commentary suggests some upgrade paths are more straightforward than others. Confirm the specific path you might take rather than assuming all steps are equally simple.
Moving systems between machines
Related and useful: Stonex material indicates STX-MC can store multiple machine profiles, with the display and GNSS antennas movable between machines — while the sensors must stay fixed to each machine and properly calibrated. [MFR]
That is a meaningful flexibility for a fleet. Sensors are the per-machine cost; the display and antennas can potentially serve more than one machine, if the work pattern suits.
It also has an obvious risk: a machine profile that does not match the machine currently fitted produces confident, wrong output. Any move between machines needs a verification step before work resumes.
[VERIFY] — confirm the profile count and the specific procedure Red Edge recommends for machine transfers.
The buying implication
Scalability changes the purchase from a single high-stakes decision into a sequence of smaller ones. Start at the tier your current work needs, prove it, and add capability when the work justifies it.
That is a better decision process — provided the upgrade path is documented and priced at the outset rather than assumed. Ask for it before you sign, not when you need it.
CTA: Ask Red Edge Resources for the documented upgrade path and component pricing for the configuration you’re considering.

Pre-publish flags: [VERIFY] upgrade component lists and pricing; machine profile count and transfer procedure.