What’s In a Stonex Machine Control Quote
Use this as a checklist
Take it into the conversation. Anything not addressed explicitly should be treated as excluded until confirmed in writing.
Configuration
☐ Which tier — 1D, 2D, 2D½ or 3D Pro? The single biggest cost driver and the first thing to pin down.
☐ Sensor configuration — which sensors, how many, on which components.
☐ GNSS receiver — which model, and confirm it matches the configuration described. (Given the SMC-ONE / SMC-TWO question outstanding across the range, ask this specifically.)
☐ Antennas — how many, which model, mounting position.
☐ Display unit — model and mounting.
☐ Connection box, cabling and looms — machine-specific, often quoted separately.
☐ Mounting hardware — brackets specific to your machine.
Positioning
☐ Correction source — base station included, NTRIP subscription assumed, or excluded entirely?
☐ Base station hardware, if applicable.
☐ Radio infrastructure, if corrections go by radio.
☐ NTRIP subscription — cost, term, and who holds the account.
Services
☐ Installation labour — included or separate, and performed where.
☐ Machine downtime — how long, and does the machine need to travel?
☐ Machine calibration and commissioning — including the attachment library.
☐ Attachment configuration — how many buckets or blades are included? Additional ones usually cost extra.
☐ Site calibration, if this is your first 3D system.
☐ Verification standard — what check is performed and what documentation you receive.
☐ Operator training — hours, number of operators, location, follow-up session included or not.
Software and ongoing
☐ Licensing model — perpetual or subscription, and what happens if a subscription lapses.
☐ Software updates — included, and how delivered.
☐ Support agreement — coverage, response commitment, term.
☐ Warranty — duration, coverage, what voids it.
☐ Loan equipment — available during repair, and at what cost.
Upgrades
☐ Documented upgrade path from your tier to the next — component list and current pricing.
☐ Labour and downtime for an upgrade.
☐ Recalibration after an upgrade — included?
Get this at purchase, not when you want it. The scalability of the platform is only worth something if the path is priced and documented.
The usual exclusions
Machine downtime. Never in the quote, always a real cost.
Additional attachments. Configuration covers the buckets you specified.
Design data preparation. A 3D system needs usable models. Producing them is work, rarely in a hardware quote.
Additional operator training. Turnover means you will train more people than the quote covers.
Recalibration after repair, component change or time in service.
Damage repair. Not warranty.
Travel for site support. Particularly outside metro areas — confirm whether it’s charged and how calculated.
Data connectivity. Where NTRIP or telemetry is used.
Four questions that reveal the gaps
“What will I need to buy in the first twelve months that isn’t on this quote?”
“If this goes down on a remote site, what does getting it running again cost me?”
“What do years two and three cost, assuming nothing breaks?”
“If I add a machine in six months, what does that quote look like?”
An evasive answer to the first is itself the answer.
On comparing
The lowest quote with the fewest inclusions is not a saving — it’s a deferral. Line quotes up against this checklist on the same scope. Usually the apparent gap largely closes, and what remains is a difference in support, which is a legitimate thing to pay for.
CTA: Red Edge Resources will quote against this checklist, exclusions included. Ask for it in writing.
Pre-publish flags: None — this article deliberately contains no prices.
Stonex Support and Spares in Australia
Start with your own number
Before evaluating any support arrangement, calculate what an hour of downtime costs on a typical job: plant, crew, supervision, and the programme consequence if the work is on the critical path.
Most contractors have never worked it out. Once they do, support quality usually dominates the difference between competing quotes.
What actually fails
Configuration and data issues. Wrong attachment selected, wrong project loaded, calibration drifted. Resolvable in minutes with the right knowledge. The largest category by a wide margin.
Sensor or component failure. Needs a physical part.
Positioning problems. Correction source unavailable, poor satellite geometry, radio or data dropout. Sometimes environmental and temporary.
Physical damage. Equipment on working machines gets hit. Not a warranty matter — it needs its own repair path and budget line.
The three things that reduce downtime
- Internal first-line capability. Because configuration and data issues dominate, someone on site who can diagnose them resolves most events immediately at no cost. This is the highest-return investment in the entire support picture, and it is routinely overlooked in favour of negotiating a response time.
- Spares holding. The question is not whether a supplier can get a part — it is where the part is right now.
- Loan or replacement equipment. The most valuable and least common. A loan unit converts a repair into a swap. Ask explicitly: available, under what circumstances, how quickly to your sites, and at what cost.
The escalation question, specific to Stonex
STX-MC is developed and supported by Stonex from Milan. That raises a reasonable question about genuine software issues.
Red Edge provides local installation, calibration, operator training and technical support, which covers the great majority of what goes wrong. But when a problem is genuinely in the software, the escalation path matters.
Ask before you buy: who takes a software issue to the manufacturer, what is the process, and what is a realistic resolution timeframe? Understanding this in advance is far better than discovering it during an outage.
Freight, honestly
Overnight courier is a metro-to-metro service. Regional freight runs on schedules. Remote freight can be weekly, and in the northern wet season it can stop.
If a next-day parts commitment is quoted, ask whether it applies to your actual site addresses. Frequently it does not, and it is better to know at purchase.
Building a spares list
For operations where downtime is expensive — remote sites especially — hold spares locally. Ask the supplier two questions:
Which components fail most often in Australian conditions?
Which components, if they fail, stop the machine working entirely?
The intersection is your spares holding. Usually a small number of items, usually justified by a single avoided outage.\[VERIFY]— a recommended spares list per Stonex configuration would be genuinely useful, differentiating content. Worth producing if the technical team can advise one.
The coverage claim\[VERIFY]— Red Edge’s live dozer page refers to certified technicians with fully-equipped mobile service vehicles throughout Australia. If accurate and substantiable, that is a strong position and should be stated consistently across the site with specifics: how many, based where, realistic response to named regions.
If it cannot be substantiated in that detail, the claim should be softened on the live page. Coverage claims are the first thing a competitor complaint targets, and “throughout Australia” is a broad one.
Warranty versus reality
Warranty covers defects, not damage — and on a working machine, damage is the more likely event.
Check the term, what is covered, what voids it, who pays freight on a return, and typical turnaround. A twelve-month warranty with a four-week turnaround and no loan unit is weaker than a shorter warranty with an immediate swap.
CTA: Ask Red Edge Resources for spares recommendations, loan arrangements and realistic response for your specific sites.
Pre-publish flags:\[VERIFY — HIGH PRIORITY]mobile service vehicle / national coverage claim.\[VERIFY]spares list; loan availability; software escalation process.
Moving a Stonex System Between Machines
The flexibility, stated accurately
Stonex material indicates STX-MC can store multiple machine profiles — up to four — with the display and GNSS antennas movable between machines, while the sensors must remain fixed to each machine and properly calibrated. \[MFR]
That distinction is the whole thing, so it is worth stating plainly rather than letting “portable system” do the work.
What moves and what doesn’t
Moves: the display unit and the GNSS antennas.
Stays: the angle sensors, fixed to each machine’s geometry and calibrated to it.
Stored: the machine profile — the configuration describing that machine’s dimensions, sensor positions and attachment library.
What this means commercially
Each machine still needs its own sensors, mounting and calibration. That is the per-machine cost and it does not go away.
What can potentially be shared is the display and antennas — genuinely useful where a fleet has machines that don’t all need guidance simultaneously. A contractor with four excavators where two are on guidance-relevant work at any time may not need four full configurations.\[VERIFY] — confirm the component split and cost implications for the configurations Red Edge supplies, so this can be stated in real terms rather than in principle.
When it makes sense
Machines used seasonally or intermittently on guidance-relevant work.
A fleet larger than the number of guided jobs running at once.
Trialling before committing — fitting sensors to several machines and moving one display around while proving the case.
A machine out of service — moving the display and antennas to a replacement rather than standing the capability down.
When it doesn’t
Machines that all need guidance at once. Obviously.
Frequent swapping. Every move is a task plus a verification step. Moving daily costs more time than a second display saves.
Where the risk isn’t managed. See below.
The verification step you cannot skip
The obvious failure mode: the display is moved, the wrong machine profile is active, and the system produces confident output based on a different machine’s geometry.
Nothing looks wrong. The display is normal, the accuracy indication is fine, and the work is wrong.
Every transfer needs a defined procedure:
Physically transfer display and antennas, mounted correctly
Select the correct machine profile — deliberately confirmed, not assumed
Verify against a known point or known surface
Test at more than one position across the working range
Record the check and the result
Only then resume work
Write this into your standard procedures rather than relying on the operator remembering. The consequence of getting it wrong is a shift of accurate, expensive, wrong work.
The profile limit
Four profiles is a real constraint on a larger fleet. A contractor with six or eight machines needs a plan for which machines are profiled, and a process for changing them.\[VERIFY] — confirm the current profile limit and whether profiles can be exported, stored and reloaded.