Setting Up a Base Station for Machine Control
Why own one
A base station buys independence. No mobile coverage dependency, no subscription, no reliance on a third party’s uptime. On a remote site it is often not a preference but a requirement.
It also introduces responsibilities that a subscription does not.
Siting
Sky view. The base needs a clear view of the sky. On a working site, that usually means elevated and away from structures, spoil stockpiles that will grow, and vegetation.
Away from the work. It cannot be somewhere that will be excavated, driven over, buried under a stockpile or disturbed by the works. Think about the site at the end of the project, not the start.
Radio line of sight. If corrections go by radio, the base needs to reach the machines. High points work better. Undulating sites may need a repeater.
Power. Mains, solar or battery, sized for continuous operation. A base that runs flat mid-shift stops the site.
Security. GNSS equipment on a stand in an accessible location is a theft target. Secure it, and consider what happens if it goes missing.
The known point
The base station sits on a point whose coordinates you know. Everything downstream inherits the quality of that point.
Establish it properly. Surveyed to an appropriate standard, tied to your site control.
Mark it permanently. A base that gets moved and re-established on a slightly different point produces a step change in everything measured after.
Protect it. Physically, and document its location so a replacement setup goes back on the same point.
Record everything. Coordinates, datum, height, antenna type and measurement method. This documentation is what lets someone re-establish the base correctly in six months when the person who set it up is gone.
Antenna height — the classic error
The single most common base station mistake in the industry: measuring antenna height incorrectly or recording the wrong measurement reference.
Get this wrong by 50mm and every machine on site is out by 50mm vertically. Consistently. Confidently. Without any error indication, because from the system’s point of view nothing is wrong.
Measure it carefully, record which reference point was measured to, and verify against a known point before releasing the site to work.
Radio versus internet delivery
Radio. No data dependency, no subscription. Limited by range and terrain. Stonex notes integrated UHF on the S850+ can reach up to 10km under optimal conditions — and “optimal” is load-bearing there. \[MFR] Real-world range in a pit or over undulating ground is substantially less.
Internet/NTRIP from your own base. Broadcast your base corrections over the internet, removing radio range limits — but reintroducing a data coverage dependency at the machine.
Many sites use radio as primary and internet as backup, or vice versa depending on coverage.
Verification before work starts
Non-negotiable, and frequently skipped:
Base established on the known point, antenna height measured and recorded
Machine or rover taken to a separate known control point
Position compared against the known coordinates
Result within tolerance, and recorded
Only then does work start
This catches antenna height errors, wrong point entry and datum mistakes — the failures that otherwise go undetected until conformance survey.
Ongoing management
Daily verification. A known-point check as part of the pre-start routine.
Change control. Any base move or re-establishment is a documented event, notified to everyone, with re-verification before work resumes.
One base per site. Multiple bases broadcasting different corrections is a genuine and expensive hazard.
Subcontractors on the same base. A subcontractor running their own base on their own control has reintroduced the whole problem. Handle it contractually.\[VERIFY] — confirm which base station hardware Red Edge supplies and supports for Stonex machine control installations.
CTA: Red Edge Resources can specify, supply and set up base station infrastructure for your sites.
Pre-publish flags: \[VERIFY] base station hardware supplied. \[MFR] UHF range — retain the “optimal conditions” qualifier.
Dual-Antenna Heading in Machine Control
The problem of knowing which way you’re pointed
A machine control system needs to know machine orientation, not just arm geometry. Without heading, the system cannot relate the bucket to a design or to slopes in more than one direction.
There are three ways to get it, and two of them are poor.
Why a magnetic compass doesn’t work
A magnetic compass on an excavator is surrounded by several tonnes of ferrous steel that moves relative to it, plus electric motors, alternators and hydraulic solenoids generating electromagnetic interference.
The local magnetic environment is both distorted and continuously changing as the machine’s own geometry moves. Calibrating that out is not practical to the precision earthworks needs.
Why inferring from movement doesn’t work
A single GNSS antenna can infer heading from direction of travel. Adequate for a vehicle that mostly drives forwards.
Useless for an excavator. An excavator spends much of its time stationary, and its most important orientation change — slewing — happens without the machine going anywhere. There is no travel direction to infer from at the moment you most need heading.
What two antennas do
Two antennas at a known separation, both receiving from the same satellites, allow the system to compute the vector between them directly. That vector is the heading.
It works stationary. It works during slew. It requires no calibration to the local magnetic environment, because it is not using magnetism.
Stonex states this approach yields excavator rotation to a precision of 0.2°. \[MFR]
The point most people miss
In STX-DIG 2D used stand-alone, the antennas are providing heading only — not position.
Without a correction source, the GNSS is functioning as a compass. It is not telling the system where the machine is on site; it is telling the system which way it is facing.
This is genuinely useful commercially. It means 2D delivers heading and double-slope capability without requiring RTK infrastructure. You get orientation awareness without a base station or a correction subscription.
It also means 2D is not a positioning system, and anyone assuming “it has GNSS, so it must know where it is” has misunderstood the tier. Worth being explicit about with customers, because the disappointment when this is discovered later is entirely avoidable.
Where heading feeds through
Double slopes. Fall in two directions requires knowing the machine’s orientation relative to both.
Bucket orientation. Not just position but attitude, which matters for profile and slope work.
Slew tolerance. Reposition and slew without losing the reference relationship.
3D positioning. With corrections, heading combines with position and attitude to place the bucket in the design.
Practical installation points
Antenna separation matters. Heading precision depends on the baseline between antennas. Mounting them closer together than specified degrades it. Follow the specified geometry.
Both need sky view. Two antennas mean two things that can be obstructed. Mounting position on the cab roof needs to account for the machine’s own structure.
They are exposed. Cab roof mounted, in the environment. Mounting quality and cable protection determine whether they survive.
Get the geometry into the configuration correctly. The system needs to know where the antennas sit relative to the machine. An error here propagates into everything downstream.
CTA: Red Edge Resources handles antenna positioning and configuration as part of installation and calibration.
Pre-publish flags: \[MFR] 0.2° figure.
RTK Corrections for Stonex Systems
Why corrections are non-negotiable
Uncorrected GNSS positioning is not accurate enough for earthworks. The errors — atmospheric, orbital, clock — are far larger than any useful construction tolerance.
Real-time kinematic corrections fix this by comparing observations at a known fixed point against the same satellites, computing the error, and sending the correction to the machine. Stonex machine control material describes RTK corrections as the route to centimetre precision.
Without a correction source, a 3D machine control system does not work as intended. It is not an optional accessory.
Two ways to get corrections
A base station. A receiver on a known point on or near your site, broadcasting corrections to machines and rovers by radio or internet.
An NTRIP network service. Subscription access to a network of permanent reference stations, delivered over mobile data.
Both feed the same receivers. The choice is about coverage, cost structure and independence.
Base station: independence
Advantages: works wherever your radio or network reaches, independent of external coverage and third-party uptime, capital cost rather than a subscription, short and consistent baselines, and full control over the reference point.
Disadvantages: capital cost up front, requires a properly established known point, needs power and physical protection, radio range is finite, and someone competent has to own it.
Best for: remote sites, long projects, large sites, multiple machines, and anywhere network coverage is marginal.
NTRIP network: convenience
Advantages: no base station hardware to buy or protect, fast deployment, consistent datum across all users, no radio range limit within coverage.
Disadvantages: requires mobile data at the machine — the binding constraint across much of Australia — ongoing per-unit subscription that scales with fleet size, dependence on a third party’s uptime, and performance that degrades with distance from the nearest reference station.
Best for: metro and regional work inside coverage, shorter jobs, operations moving frequently between sites, smaller fleets.
The 2D½ connection
Worth linking explicitly: the STX-DIG 2D½ module takes elevation from an NTRIP signal through the GNSS antenna, removing the need for a laser receiver on the stick and a laser level on the ground.
That means corrections are not only a 3D concern. If you are considering 2D½, a correction source is part of the purchase, and its cost belongs in the comparison against simply using a laser.
Testing coverage properly
The most common and most avoidable mistake with network corrections.
Coverage maps are published at a level of abstraction that does not reflect a machine in a cut. Test at the actual working location, at machine level, in the part of the site where the machine will spend its time — not from a ute parked on the highest point.
Mobile data coverage at the site office and mobile data coverage in the bottom of the excavation are frequently different answers.
Redundancy
Where downtime is expensive, running both is defensible. Network corrections for normal operation, base station as fallback when the mobile network drops out.
The additional cost is typically recovered by a single avoided outage. Work out your hourly cost of a stood-down crew and the arithmetic usually makes itself.
The datum warning
Corrections give accurate position in a global reference frame. Site calibration is what ties that to your site coordinate system.
Changing correction sources mid-project without understanding the datum implications is a reliable way to produce machines that disagree with survey. If you switch sources, verify against known points before resuming work, and document what changed.\[VERIFY] — confirm which NTRIP services Red Edge recommends, supports or resells for Australian customers, and whether any subscription is bundled with system purchase.