STX-MC: The Stonex Machine Control Software
The layer that decides adoption
Machine control conversations focus on hardware — sensors, receivers, antennas, accuracy. Reasonable, since that is what determines what the system can theoretically do.
But whether a system delivers is decided somewhere else: at the screen, in the first week, by an operator under production pressure deciding whether this is helping or getting in the way.
That decision is made about the software.
What STX-MC is
STX-MC is Stonex’s machine control software, developed for Android and running across the machine control range — excavators, dozers, wheel loaders. Stonex develops and supports it from its headquarters in Milan.
It is modular: the same software runs 1D, 2D, 2D½ and 3D Pro, with capability determined by the modules and hardware in the configuration.
Why Android matters practically
Not a technical footnote — an adoption argument.
Familiar interaction. Anyone who uses a smartphone already knows how to touch, swipe and navigate. The interface does not need to be learned from zero.
Lower training threshold. Training can focus on the machine control concepts — references, calibration, working to design — rather than on operating the device.
Readable display. Modern touchscreen conventions, designed to be interpreted at a glance rather than studied.
The modular structure
One software layer across every tier has consequences worth naming:
Upgrades don’t restart the learning curve. An operator moving from 2D to 3D Pro sees an interface they recognise with additional capability, not a new system.
Cross-machine consistency. An operator moving from an excavator to a dozer on the same software platform is not starting again.
One training programme. Across tiers and platforms. On a mixed fleet this is a real and recurring saving.
What the software handles
Machine configuration. Machine geometry, attachment dimensions, sensor setup. Getting this right is the foundation of accuracy — and wrong attachment configuration is the most common cause of “the system is inaccurate” complaints across every brand of machine control.
Reference and slope setup. Establishing height references and setting slopes and excavation parameters.
Real-time guidance display. Bucket or blade position against target, continuously.
Design file management. For 3D Pro, importing and managing georeferenced projects, supporting multiple CAD formats. [VERIFY] — confirm the current supported format list rather than stating it generically.
Machine profiles. Multiple machine configurations stored, supporting movement of components between machines. [MFR]
Data transfer. File transfer for designs and configurations. [VERIFY] — confirm current transfer methods for the configurations Red Edge supplies.
What to ask about the software
Hardware gets scrutinised at purchase; software rarely does. Ask:
How are software updates delivered, and are they included?
Is the software licensed perpetually, or by subscription?
What happens to the system if a subscription lapses?
What languages and unit systems are supported?
How is design data actually loaded onto the machine?
Is there documentation written for operators rather than engineers?[VERIFY] — the licensing question in particular needs a definitive answer for each product line. Getting this wrong in either direction is a consumer law problem, not just an accuracy one.
The support question
Software developed and supported in Milan raises a reasonable Australian question: what happens when the issue is genuinely a software one?
The practical answer is about escalation. Red Edge provides local installation, calibration, training and technical support; the escalation path to the manufacturer for genuine software issues is worth understanding before you need it.
Ask who takes a software problem up, and what a realistic resolution timeframe looks like.
CTA: Red Edge Resources provides local installation, calibration, training and support for Stonex systems. Ask how software issues get escalated and resolved.
Pre-publish flags: [VERIFY] supported CAD formats; data transfer methods; licensing model.
Upgrading a Stonex Machine Control System
Why this matters more than it sounds
The usual machine control purchase locks in a capability level. Outgrow it and you replace the system, absorbing the whole cost again and putting operators through a new interface.
Stonex designs the STX-DIG platform around scalability instead: install at one level and add components to move up, rather than replacing what you have. [MFR]
For a contractor whose work is changing — or who simply does not want to bet on a forecast — that structure is the commercially interesting part of the platform.
What carries forward
Angle sensors. The sensors on boom, stick, bucket and frame are the foundation of every tier and stay in place.
STX-MC software. The same Android software runs across the range. Modules are added, but the operator is not learning a new system.
Operator familiarity. Underrated and worth real money. An upgrade that does not require retraining from scratch is an upgrade that gets used from day one.
Installation work. The mounting, cabling and machine integration already done.
What gets added at each step
1D → 2D: heading capability. Two passive antennas on the cabin roof and a dual-antenna GNSS receiver.
2D → 2D½: the NTRIP elevation module, plus access to a correction source. Removes the laser receiver and laser level.
2D → 3D Pro: GNSS positioning with corrections, design import capability, and the off-machine workflow to produce and georeference projects.[VERIFY] — obtain the exact component list and current pricing for each upgrade step from Red Edge. This article is considerably more useful with real component lists, and it is the kind of specific, practical content that earns links and enquiries.
What to confirm before relying on it
Scalability is a design intention. Whether it holds for your specific installation depends on details, so get these answered before purchase:
Is my configuration upgradeable, specifically? Not the platform in general — the exact configuration being quoted.
What is the component cost of each step? In writing, current at time of quote.
What labour is involved? An upgrade requiring a full re-install is not much of an upgrade.
How much machine downtime? Costed at your plant rate, this can exceed the component cost.
Does recalibration follow? Almost certainly yes. Confirm who does it and whether it is included.
What are the software licensing implications? Do added modules carry licence costs, one-off or recurring?
Note also that third-party commentary suggests some upgrade paths are more straightforward than others. Confirm the specific path you might take rather than assuming all steps are equally simple.
Moving systems between machines
Related and useful: Stonex material indicates STX-MC can store multiple machine profiles, with the display and GNSS antennas movable between machines — while the sensors must stay fixed to each machine and properly calibrated. [MFR]
That is a meaningful flexibility for a fleet. Sensors are the per-machine cost; the display and antennas can potentially serve more than one machine, if the work pattern suits.
It also has an obvious risk: a machine profile that does not match the machine currently fitted produces confident, wrong output. Any move between machines needs a verification step before work resumes.[VERIFY] — confirm the profile count and the specific procedure Red Edge recommends for machine transfers.
The buying implication
Scalability changes the purchase from a single high-stakes decision into a sequence of smaller ones. Start at the tier your current work needs, prove it, and add capability when the work justifies it.
That is a better decision process — provided the upgrade path is documented and priced at the outset rather than assumed. Ask for it before you sign, not when you need it.
CTA: Ask Red Edge Resources for the documented upgrade path and component pricing for the configuration you’re considering.
Pre-publish flags: [VERIFY] upgrade component lists and pricing; machine profile count and transfer procedure.
Which STX-DIG Tier Do You Need?
Start with the work
The most expensive machine control decision is buying a tier that does not match the work — in either direction.
Work through these questions in order.
Question 1: Do you need fall in more than one direction?
No — a single depth or level, side profile only → 1D is likely sufficient.
Yes — crossfall, compound slopes, shaped inverts → 2D minimum.
Most contractors overestimate here. Be honest about what the majority of your work actually requires, not the hardest job you did last year.
Question 2: Do you need to work against a design model?
No — you work to levels and slopes you establish on site → 1D, 2D or 2D½.
Yes — you work to a design surface, tied to a site datum, possibly shared across machines → 3D Pro.
This is the biggest step in the range, in capability and in overhead.
Question 3: Do you have a correction source?
Relevant if you have landed on 2D and are weighing 2D½.
Yes, RTK network access or a base station, with data coverage at machine level → 2D½ is attractive. Elevation from NTRIP, no laser.
No, and no plan to get one → 2D with a laser reference.
Question 4: Do you have usable design models and someone to manage them?
Only relevant if question 2 pointed to 3D Pro.
Yes → proceed with 3D Pro.
No → resolve this first. A 3D system without a data workflow is an expensive 2D system. This is worth pausing the purchase over.
Question 5: How is the work likely to change?
Because the platform is scalable, this is a lighter question than it would otherwise be. The relevant thing is not predicting three years out — it is confirming the upgrade path in writing for the configuration you are buying, so the option is real when you want it.
Typical matches
Owner-operator, drainage and general digging → 1D. Depth control, laser reference, low cost, quick to learn.
Civil contractor, mixed drainage and pad work → 2D. Double slopes, heading, works from local references.
Civil contractor with RTK already in place → 2D½. Same capability, laser removed.
Earthworks contractor on design-driven projects → 3D Pro. Full model in the cab.
Mining contractor, large sites → 3D Pro with site infrastructure.
Contractor testing the concept → 1D or 2D on the highest-utilisation machine, then expand on measured results.
The mistake to avoid in both directions
Buying too high is the common one. 3D Pro purchased because it is the flagship, then run as a 2D system because nobody owns the data workflow. Capital spent, capability unused, and the operator’s experience is of an over-complicated system.
Buying too low happens too. A contractor whose work is genuinely design-driven buying 2D to save money, then spending the difference on manual set-out every month.
The scalability of the platform means the first mistake is more common and the second is more recoverable. But both are avoidable by answering question 1 and question 2 honestly.
The question to ask your supplier
“Based on the work I’ve described, what’s the lowest tier that would do the job?”
A supplier who answers with a lower tier than you expected is giving you advice. One who confirms whatever you suggested is taking an order.
CTA: Describe your work to Red Edge Resources and ask for the lowest tier that covers it.
