STX-DIG for Batters and Bulk Excavation
Batter formation
Forming a batter to a specified angle by eye is a cycle: form, check, adjust, check again. Each check means somebody on the face with a gauge, standing on freshly disturbed ground, often with plant working above or below.
With slope guidance, the operator sees the achieved angle in the cab and works the face to design on fewer passes. The check becomes a display reading rather than a physical inspection.
Which tier: batter work with fall in one direction can be handled at the lower tiers. Compound batters — a slope with a longitudinal grade along it — need the heading capability that 2D provides, because the system has to understand the machine’s orientation relative to both directions of fall.
Shaped bulk excavation
Where the excavation is a shaped surface rather than a flat bottom — basements, detention basins, complex subgrade, shaped platforms — the design cannot be reduced to a level and a fall.
This is 3D Pro territory. The georeferenced design goes into the cab and the operator works to it directly, seeing cut and fill against the design at their actual position.
The gain is largely the elimination of set-out. Without 3D, a shaped excavation needs extensive pegging and repeated survey to communicate the design to the operator. With it, the shape comes from the model.
Working near edges
Guidance makes it easier to work confidently close to a design edge. That is the point, and it comes with a caution worth stating plainly.
Confidence about the design is not confidence about the ground. The system knows where the design surface is. It does not know whether the material will stand at that angle, whether there is a saturated layer behind the face, whether the crest is undercut, or whether the machine is sitting on competent ground.
Slope stability is a geotechnical question, assessed under the relevant standard, and entirely unaffected by having a guidance system fitted. An operator working precisely to a design batter in unsuitable material is producing an accurate failure.
Crest exclusion zones, machine positioning rules, inspection regimes after rain, and geotechnical assessment appropriate to the height and material all apply exactly as before.
The over-excavation link
Worth naming in this context because the productivity and safety arguments align.
Cutting past a design batter produces a steeper or higher face than the design assumed, plus material to bring back and recompact. Both make the batter worse than designed and both add exposure.
Working accurately to the design is the safer outcome as well as the cheaper one.
Blind digging
A capability that comes into its own here and gets little attention.
When the bucket is out of sight — below water, behind an obstruction, under a structure, at the bottom of a deep cut where the operator’s sightline is poor — the operator normally has no information at all. Stonex specifically identifies blind and underwater digging as tasks the system simplifies, because the bucket position remains visible on screen regardless of whether it is visible in reality. [MFR]
For work in and around water, or in deep constrained excavations, this is not a marginal benefit.
Tier summary for this work
Simple batter, one direction of fall → 1D or 2D depending on the reference arrangement
Compound batter or double slope → 2D minimum
Shaped bulk excavation to a design → 3D Pro
Work tied to a site datum with multiple machines → 3D Pro with site infrastructure
CTA: Red Edge Resources can match an STX-DIG configuration to the excavation work you actually do.