STX-DIG for Trenching and Drainage
The application that pays fastest
For a lot of Australian contractors, drainage and service trenching is where machine control produces the clearest return. The work is repetitive, tolerance matters, and the conventional method requires somebody in the excavation.
The conventional method
Pegs set out. A laser and staff, or a boning rod. The operator digs to what looks right. Someone climbs in and checks invert. The operator adjusts. Someone checks again.
Repeated along the run, all day.
What changes
The operator sees the distance to design invert and the achieved fall continuously, in the cab.
No one in the trench for routine checking. The highest-consequence routine task on a drainage crew, eliminated. That is an exposure reduction, achieved by removing the reason for the task — not by any detection capability. The system does not see people, and every rule about excavation entry and plant separation is unchanged.
Consistent fall along the run. Not a fall that averages out across the length while varying within it.
No habitual overcut. Operators build in a margin because cutting short means coming back and cutting deep can be filled. Remove the uncertainty and the margin goes with it — which directly reduces bedding material consumption.
Continuous work. No stop-start cycle for checking. The rhythm changes from dig-stop-check-adjust to a continuous cut.
The offsider is doing something else. On a small crew, this is often the whole business case on its own.
Which tier
1D covers a great deal of drainage work. Depth against a reference, side profile, laser or existing surface as the height reference. For a straight run at consistent fall, it does the job.
2D earns its place where the work has cross-grade as well as longitudinal fall, or where the machine slews frequently and needs to hold the reference relationship. Double slopes are the specific capability.
2D½ is 2D without the laser — elevation from an NTRIP stream instead of a laser receiver on the stick and a laser level on the ground. If you already have correction access, this removes a piece of field equipment from every job.
3D Pro applies where drainage is part of a wider design tied to a site datum, or where multiple services at different levels need to be worked against a model.
Most drainage crews land at 1D or 2D, and there is no virtue in buying past that.
The bedding material argument
The financial case that lands best with drainage contractors.
Over-excavating a trench by even a modest habitual margin means the difference gets filled with bedding material. Along a run of any length, that is a real volume of purchased material, carted and placed, for no design benefit.
Work out your typical overcut margin — most operators will tell you honestly what they take — multiply by your run lengths and trench widths, and cost it at your bedding rate. It is usually a number that makes the conversation short.
Practical points
Bucket configuration is critical. Drainage crews change buckets often. The system needs the correct bucket selected, and wrong bucket selection is the most common cause of accuracy complaints. Build it into the pre-start routine rather than relying on memory.
Guidance does not locate services. A system that knows precisely where the bucket is has no idea what is buried in front of it. All service location procedures apply exactly as before.
Ground support is unaffected. Depth accuracy is not shoring. Trench support requirements under the relevant standard are unchanged.
CTA: Red Edge Resources can specify the right STX-DIG tier for your drainage work — often a lower one than you’d expect.