Solar Power for a Permanent GNSS Base Station

A base station that runs out of power at three in the morning and recovers by nine is worse than one that fails outright. The outright failure gets reported and fixed. The intermittent one gets blamed on the rovers, the radio, the weather and the operators for a fortnight before anyone checks the battery voltage log.
Undersized or poorly protected power is the most common cause of unreliable permanent base stations. It’s also the most straightforward to get right, because unlike antenna siting or radio propagation, it’s arithmetic.
Work out the load first
Everything follows from the continuous current draw. You need real numbers for:
The GNSS receiver. Check the manufacturer’s specification for continuous draw at your operating configuration, not the peak or the typical figure from a datasheet summary.
The radio, if fitted. This is usually the largest and most variable load, because transmit current is much higher than receive. A UHF base radio transmitting corrections continuously draws considerably more than the same radio idle. Use the transmit figure at your output power, not the average.
The modem, if fitted. Cellular modems draw more when signal is marginal and they’re working harder to hold a connection.
The cooling fan. Small, but it runs when it’s hot, which is also when the solar is producing — usually a wash.
Everything else. Router, switch, monitoring device, indicator lights.
Add them, convert to amp-hours per day, and that’s your daily energy budget. This is the number the whole system is sized from, and it’s the number most people guess.
Sizing the battery
Two constraints set the battery capacity: how many days of autonomy you want, and how deeply you’re prepared to discharge.
Autonomy. Three to five days is the usual target for a site base station in Australia. That covers a run of overcast days without intervention. Less than two days of autonomy means a wet week takes the base down.
Depth of discharge. This is where lithium iron phosphate and lead acid diverge sharply. A LiFePO4 battery tolerates deep discharge routinely. A lead acid battery discharged deeply and repeatedly loses capacity quickly. In practical terms, a lead acid bank has to be roughly twice the nominal capacity of a LiFePO4 bank to deliver the same usable energy over a comparable service life.
LiFePO4 costs more up front and is usually the better answer for a permanent installation, particularly where the enclosure is in a hot environment and the site doesn’t have anyone checking on it weekly.
Temperature matters. Battery capacity and charge acceptance both change with temperature, and a battery sitting in a hot container will behave differently from the datasheet. Charging LiFePO4 below freezing is a separate problem, relevant on high-altitude and southern sites in winter — most quality batteries with an integrated BMS handle this, but confirm it rather than assume it.
Sizing the solar array
Take the daily energy budget, divide by the worst-case daily solar yield for the site’s location and panel orientation, and add margin for panel soiling, temperature derating and controller losses.
The worst-case figure is the one that matters. Sizing to an annual average produces an array that works beautifully for nine months and fails through the shortest, cloudiest weeks of the year. Australian solar irradiation data by location is publicly available and worth using rather than estimating.
Practical points:
Fixed frames are fine. Tracking systems add moving parts and failure modes for a marginal gain at this scale.
Orientation and tilt. North-facing, at a tilt angle that favours winter yield rather than annual total, is the usual choice for a system sized around the worst month.
Shading is a cliff, not a slope. Partial shading of one panel can disproportionately reduce output from a string. Check the shading through a full day, in winter, when shadows are longest.
Soiling. Dust on a panel on a mine site is not a minor derate. Either accept a substantial soiling allowance in the sizing, or put panel cleaning on the maintenance schedule.
Mount them where they can be reached. Panels on a container roof that needs a scissor lift to access won’t get cleaned.
The charge controller
An MPPT controller extracts more from a given array than a PWM controller, particularly in cool bright conditions and when the array voltage is well above the battery voltage. For a permanent installation, MPPT is the default.
Two things to check when specifying:
Battery chemistry support. The controller must have a lithium charge profile if you’re running LiFePO4. A lead acid profile applied to a lithium bank charges it incorrectly.
Current rating with headroom. Size the controller above the array’s short-circuit current with margin, so it isn’t running at its limit on the best day of the year.
DC distribution and protection
This is the part that gets skipped, and it’s the part that causes fires and mystery faults.
A properly built base station DC system has:
A battery terminal fuse. Directly at the battery positive terminal, so a short anywhere downstream — including in the main cable — is protected. An MRBF or ANL type is standard.
A battery isolator switch. So the system can be shut down for work without pulling terminals.
Individual circuit protection. A breaker per circuit, so a fault in the modem doesn’t take down the receiver, and so faults can be isolated by someone who isn’t an electrician.
DIN rail and terminal blocks. Every connection landed on a terminal, not a twisted joint or a chocolate block. This is what makes a system diagnosable two years later by someone who didn’t build it.
A battery monitor or shunt. State of charge visible at a glance. Without it, nobody knows the system is marginal until it fails.
Correctly sized cable. Sized for the current and the run length, with voltage drop calculated rather than assumed. Heavy DC cable at low voltage is unforgiving of undersizing.
Proper terminations. Crimped lugs, heatshrink, and cable supported so the terminal isn’t carrying weight.
We build braided harnesses and DC distribution in our own workshop, so a fitted enclosure comes wired to a consistent standard rather than assembled on site with whatever was in the ute.
How this fits the enclosure
The base station enclosure has room inside for the receiver, radio, charge controller and DC distribution, with an internal backing panel and DIN rail available as an option. The battery mounts on the stand below the box, clear of the equipment.
For anything beyond a single standard battery — a larger bank, or a bank plus separate solar input protection — the mounting arrangement needs to be worked out before fabrication, because it affects the stand. Tell us the battery configuration when you enquire, not after the box arrives.
CTA: Talk to us about a base station enclosure with power and DC distribution built in. Call 1300 769 359 or email [email protected].

Ventilated vs Sealed Enclosures: An Honest Look at the Trade-Off

There’s a decision in every enclosure specification that people tend to make by accident. Ventilated or sealed. It gets decided by whichever quote came in first, or by an IP number copied out of an old specification, and the consequences show up two summers later.
The trade-off is simple to state and impossible to avoid: an enclosure that lets air move lets everything else in the air move too. You can have airflow or you can have ingress protection. Not both, at least not without spending significantly more.
What ventilated means in practice
A ventilated enclosure has deliberate openings — a mesh panel, louvres, a fan aperture — that allow air to exchange between inside and outside.
What you get:
Internal temperature stays close to ambient, rather than climbing above it
No thermal derating on the equipment inside
Much lower cost, because there’s no sealing system, no gaskets and no cooling hardware
Simpler maintenance — no gasket inspection, no desiccant, no condensation management
Lighter, because the enclosure isn’t doing thermal work through its walls
What you give up:
Dust gets in. On a mine site, quarry or unsealed haul road environment, it gets in continuously.
Moisture gets in. Not driving rain if the enclosure is undercover, but humidity, and condensation when the temperature swings.
Insects and vermin get in, unless the mesh is fine enough, and fine mesh restricts airflow.
The enclosure cannot be mounted in the open.
What sealed means in practice
A sealed enclosure has a continuous gasket, sealed penetrations and an IP rating that describes what it keeps out. IP66, for example, describes protection against dust ingress and against powerful water jets.
What you get:
Equipment stays clean and dry
Outdoor mounting becomes possible
Longer service intervals on the equipment inside
What you give up:
Heat has nowhere to go except through the enclosure walls. In direct sun, a sealed box becomes a solar oven.
To manage that, you need active thermal management — a heat exchanger, a thermoelectric cooler, or air conditioning. All of these cost money, consume power, and add their own failure points.
Or you oversize the enclosure substantially to increase surface area, which costs money and space.
Condensation becomes a management problem. A sealed box that breathes through a temperature cycle will accumulate water inside it unless it has a breather vent or desiccant.
The last point catches people out. A sealed enclosure isn’t a sealed environment. Air inside expands and contracts with temperature, and unless there’s a pressure equalisation path, the seal is being cycled. Add a breather and you’ve compromised the IP rating you paid for.
How to decide
The decision follows from where the enclosure is going, not from what’s in it.
Choose ventilated if: the enclosure will be installed undercover — inside a shipping container, shed, workshop, plant room, switchroom or covered compound area — and the ambient dust load is moderate. This covers the majority of permanent GNSS base station installations, because bases are usually established in a site compound.
Choose sealed if: the enclosure will be mounted in the open with no overhead protection, or the environment is severe enough that dust ingress will foul the equipment regardless. Coastal exposure, high-pressure wash-down areas, and dusty processing plant environments all point to sealed.
A middle path exists: a ventilated enclosure inside a purpose-built shelter or under a roof. This is often cheaper than a sealed cabinet with active cooling, and easier to service. Where the site can provide the cover, it’s usually the better engineering answer.
Where the Red Edge enclosure sits
We build a ventilated enclosure. It has an expanded aluminium mesh vent panel in the door and a cut-out for a cooling fan.
It is not IP-rated, and we don’t recommend exposed outdoor mounting without additional weather protection.
We say that plainly because the alternative is a customer discovering it after installation. The mesh door and the fan cut-out are there to move air, and that means dust and moisture can get in as well. The enclosure is built for undercover installation — containers, sheds, workshops, plant rooms.
If your site needs a sealed outdoor cabinet, that’s a different product, and there are Australian manufacturers who build them properly. We’d rather point you there than sell you the wrong box.
What to do about dust in a ventilated enclosure
If you’re going ventilated, a few things reduce the dust load without closing the box up:
Filter the fan intake. A filtered inlet with a serviceable element catches most of what a fan draws in. It needs to be on the service schedule, because a blocked filter is worse than no filter.
Positive pressure. A filtered fan blowing in, rather than out, keeps the enclosure slightly above ambient pressure, so leakage flows outward. This is the same principle used in operator cab pressurisation, and it works at enclosure scale.
Mount the vent away from the dust source. Vent panels facing away from a haul road or crusher see a fraction of the load.
Conformal coating. For equipment that’s going to live in a dusty environment for years, coated boards tolerate it better.
Schedule a blow-out. Compressed air through the enclosure at each service interval, with the equipment isolated. Ten minutes, once a quarter.
The specification mistake to avoid
Copying an IP rating from a previous specification without checking the thermal consequence is the most common enclosure error we see. IP66 gets written into a document because it appeared in the last one, the enclosure gets bought, it’s installed in a container in the Pilbara with no cooling, and the equipment inside starts throttling in November.
The right sequence is: establish where it’s going, establish the thermal load, then choose the ingress strategy that’s compatible with both. The IP rating is an output of that process, not an input.
CTA: Not sure which side of this decision your site sits on? Call 1300 769 359 and talk it through with us before you specify.

Container-Mounted GNSS Base Stations: A Practical Setup GuideAlmost every Australian site of any size has a shipping container in the compound. It’s already there, it’s already lockable, it’s usually already near power, and it’s shaded. For a permanent GNSS base station, that combination is hard to beat — which is why container-mounted bases have become the default on mine sites, civil projects and renewables construction.Doing it well takes a bit more than putting the receiver on a shelf.Why a container worksIt’s undercover. A ventilated enclosure needs to be out of direct weather, and a container provides that without any additional structure.It’s secure. The container is already locked at night and already part of the site’s security arrangements. A base station inside it inherits that.It’s stable. A container sitting on its corner castings or a prepared pad doesn’t move. That matters, because a base station’s whole job is to sit on a known coordinate.It has power, usually. Compound containers are often already connected to a genset, mains or a solar array, which removes the biggest constraint on a permanent base.It’s shaded. Not cool — a closed container in summer gets hot — but out of direct sun on the equipment itself.Heat is still the main problemA steel box in the sun is a good oven. Container internal temperatures well above ambient are routine through a Queensland or Pilbara summer, and that’s before you add a transmitting radio.So the container solves the weather problem and makes the heat problem worse. Three things help:Ventilate the container itself. Whirlybirds, louvres, or a powered extraction fan. If the container has no air movement at all, nothing you do to the enclosure inside it will be enough.Ventilate the enclosure. A mesh vent panel and a fan cut-out let the enclosure exchange air with the container. A thermostat-controlled fan runs only when it needs to, which matters if the base is on battery and solar.Position sensibly. Away from the sun-facing wall, away from the roof, and not directly above a genset or compressor.Antenna siting is the hard partThe container is the easy bit. The antenna is where container installs get compromised, because the antenna needs a clear view of the sky and the container is a metal box.Practical guidance:Roof mount is the usual answer. A pole or mast on the container roof, braced properly, gets the antenna above the container and clear of surrounding structures.Watch the multipath. A container roof is a large flat conductive surface. An antenna mounted close to it will see reflected signals. Getting the antenna up on a mast rather than sitting it on the roof deck makes a measurable difference.Keep the coax run short and protected. Every metre of feeder is loss, and every unsupported metre is a future failure. Run it in conduit or tray, support it at intervals, and bring it into the enclosure through a bulkhead lead-through rather than a gland.Think about the whole compound. Cranes, light towers, laydown stacks and other containers all move over the life of a project. An antenna position that’s clear on day one can be shadowed by month six.The base coordinate is the thing that has to survive. If the container is ever moved, relevelled or replaced, the antenna position changes and the base is no longer where it thinks it is. Fix the container’s position in the site plan and make sure the site team knows the container can’t be shifted without the survey team being told.Cable entry into the containerContainer walls are corrugated steel, which makes for awkward penetrations. A few conventions that work:Use the existing vent apertures or a purpose-cut and glanded penetration in a flat section, not the corrugation.Seal from the outside, with a hood or drip loop above the entry, so water running down the corrugation doesn’t track in.Bring antenna coax and power in at different points where practical, to keep the DC run away from the feeder.Label everything at both ends. Containers get re-fitted, and unlabelled cable gets cut.Mounting the enclosure insideThe base station enclosure and stand together stand about 1,850 mm. In a standard container that leaves clearance above, and puts the equipment at a workable height.The stand feet are drilled for floor or plinth fixing. Bolting the stand to the container floor is worth doing even where it feels unnecessary — a container gets moved, tilted on a tilt-tray, and shunted, and an unfixed 1.8 m assembly with a battery on it will go over.Where floor space is scarce, the wall-mount version without the stand fixes to the container wall directly, with the battery relocated to a separate mount.Leave working space in front of the door. A full-height hinged door needs room to swing, and someone will eventually need to get in there with both hands and a multimeter.Power and batteryIf the compound has a supply, the base runs off it with a battery for ride-through during genset changeovers and outages. If it doesn’t, solar and a deep cycle battery are the standard answer.Either way, the DC side wants a proper isolator, protection on each circuit, and a battery monitor so the state of charge is visible without a meter. We cover this in more detail in a separate article on powering a permanent base station.The battery mount on the stand puts the battery below the enclosure, clear of the equipment, which keeps the heaviest item low and makes swaps straightforward.Security and accessThe container gives you perimeter security. The enclosure’s full-height door has a hasp for padlocking, which gives you a second layer — useful where a lot of people have container access but only a few should be inside the base station.Padlocking also stops the well-meaning intervention: someone opening the box because a light is flashing, and turning something off.Getting the sizing right before you orderThe most common problem we see is an enclosure sized to the receiver and nothing else. By the time the radio, the charge controller, a modem, the DC distribution and a spare gland run are in there, the box is full and there’s nowhere to put the thing that gets added next year.Before ordering, list every item going inside, with dimensions, and add space for one more. We build to order in Brisbane, so a non-standard size is a normal request rather than a special.CTA: Tell us what needs to fit inside and we’ll size the enclosure to suit. Call 1300 769 359 or email [email protected].

GNSS Base Station Enclosures: What a Fixed Base Actually Needs

A permanent GNSS base station is a small collection of expensive, sensitive equipment that has to sit in one place, powered and communicating, for months or years at a time. The receiver, the radio or modem, the charge controller, the DC distribution and the battery all need somewhere to live. On a lot of sites, that somewhere ends up being a plastic tub in the corner of a container, a milk crate, or a hastily drilled sheet of ply screwed to a wall.
That works until it doesn’t. The failures are rarely dramatic. A fan-less box in a north-facing container gets hot enough through summer that the receiver starts dropping out in the afternoon. A power lead gets snagged and pulls a terminal off. Someone borrows the battery for a light plant. An antenna cable gets kinked behind a shelf. Each one costs a rover crew or a machine control fleet a session of positioning, and the cause is almost never obvious from the field end — the crew just sees corrections stop.
The enclosure is the part of a base station install that gets the least thought and prevents the most of these problems. This guide covers what to look for.
What lives inside a base station enclosure
A typical fixed base has more in it than people expect:
The GNSS receiver. On a permanent install this is usually a dedicated base receiver rather than a rover doing double duty. It needs to stay powered, stay cool and stay put.
A radio or modem. Either a UHF radio broadcasting corrections locally, a cellular modem pushing to a caster, or both. Both generate heat under transmit.
A charge controller. If the base runs on solar or an unreliable site supply, there’s an MPPT or PWM controller between the source and the battery.
DC distribution and protection. Breakers or fuses, an isolator, terminal blocks, and ideally a shunt so someone can see the state of charge without pulling covers off.
A battery. Usually 12 V, and usually the heaviest single item, which is why it belongs low and separate rather than sitting on a shelf above the electronics.
Fitting all of that into a box designed for something else is where most improvised installs come unstuck. There’s either no room for the DC gear, or no way to get the antenna cables in without leaving a hole.
Heat is the first constraint
Electronics in a sealed metal box in the Australian sun will cook. A GNSS receiver and a transmitting radio together produce a steady thermal load, and an unventilated enclosure has nowhere to put it except through the walls. Internal temperatures well above ambient are normal in that situation, and the practical result is thermal throttling, shortened battery life and intermittent dropouts that look like a signal problem rather than a heat problem.
There are two ways to deal with it. Move air through the box, or seal the box and move heat out of it some other way — a heat exchanger, a thermoelectric cooler, or simply a much bigger enclosure with a lot more surface area.
Moving air is far cheaper and far simpler. A vented door and a fan cut-out handle the thermal problem for a fraction of the cost of a sealed, actively cooled cabinet. The trade-off is direct and unavoidable: air that carries heat out also carries dust and moisture in. This is not a detail to gloss over, and we’ve written about it separately, because it determines where the enclosure can and can’t go.
Ventilated enclosures are for undercover installation
The Red Edge base station enclosure is a ventilated design. The door carries an expanded aluminium mesh vent panel, and there’s a cut-out for a cooling fan. It is not IP-rated, and we don’t recommend exposed outdoor mounting without additional weather protection.
That’s a real constraint, not a caveat. It means the enclosure is built for:
Shipping containers and site offices
Sheds and workshops
Plant rooms and switchrooms
Covered areas within a site compound
And not for a bare post in the open on a greenfield site. If the base has to sit fully exposed, you need a sealed, IP-rated cabinet with a thermal management strategy that isn’t ambient airflow, and that is a different and more expensive product. Knowing which of those two situations you’re in before you order is the single most useful decision in the process.
Construction: why the material and the welding matter
The enclosure is 3 mm aluminium, TIG welded throughout, in a natural aluminium finish. A few practical consequences follow from that.
Aluminium doesn’t rust, which matters on coastal sites and in wash-down areas. It’s light enough that a two-person lift is realistic during install, which is not true of an equivalent steel cabinet. And 3 mm is thick enough that the box holds its shape when it’s dragged across a container floor, bumped by a forklift tyne, or drilled for a new gland run two years after it was built.
TIG welding throughout, rather than folding and riveting, means the seams don’t work loose under vibration. Containers and plant rooms both vibrate — from doors, from machinery, from vehicles moving nearby — and a riveted box slowly rattles itself into a looser box.
The finish is left as natural aluminium as standard, and can be powder coated or painted to a site colour where a client’s standards require it.
The stand and the battery
The box sits on a matching stand, 950 mm high, painted black, with a braced welded frame. The stand carries an integrated 12 V battery mount, 500 × 190 × 45 mm, positioned below the box so the battery sits clear of the equipment.
That arrangement solves a few things at once. It keeps the heaviest item at floor level, which makes the whole assembly stable. It keeps battery gassing and any leakage away from the electronics. It puts the receiver and radio at roughly chest height, which is where you want them when you’re commissioning a base at 5 am with a head torch. And it lets someone swap a battery without opening the equipment compartment at all.
Overall height with the box mounted is approximately 1,850 mm. The stand feet are drilled for floor or plinth fixing, so the assembly can be bolted down in a container or to a concrete plinth in a compound.
There’s also a wall-mount version without the stand, for plant rooms where floor space is the constraint and there’s a suitable structural wall.
Cable entry is where installs are won or lost
Every cable that enters the enclosure is a hole in it. Antenna feeder, power in, ethernet or serial out, solar input — that’s four to six penetrations on a typical base.
Done properly, each one gets a gland or a bulkhead connector sized to the cable, tightened onto the sheath, with the cable supported so the weight and any movement is taken by a clamp rather than by the gland or the terminal. Antenna coax gets an N-type bulkhead lead-through rather than being passed through a gland, so the connector is serviceable from outside and the run inside is short and fixed.
Done badly, cables come in through an oversized hole with a bit of tape around them, and the enclosure becomes a funnel for dust and water and a strain relief for nothing.
We build cable glands and antenna lead-throughs in as an option, sized to what’s actually going in, along with braided harness and DC distribution assembled in our own workshop.
Built to order, and what “standard supply” means
The standard supply is the box and the stand, built to order and empty. The receiver, radio, charge controller, battery, fan and internal wiring shown in the product photographs are an example of a customer fit-out — they are not part of the standard supply.
This matters for procurement. If you want a wired and tested unit delivered ready to power up, that’s a fitted unit and we quote it as a separate line, with the internal scope agreed before fabrication starts. If your own electrical team is doing the fit-out, the empty box with a backing panel and DIN rail is usually the right buy.
Options on the standard box include powder coat or paint to your colour, a cooling fan fitted with or without a thermostat, an internal backing panel and DIN rail, cable glands and antenna lead-throughs, the wall-mount variant, and non-standard sizes to suit equipment that doesn’t fit the standard envelope.
Where the enclosure sits in the wider base station decision
An enclosure is one part of a permanent base install. The others — antenna siting and sky view, mount stability, the coordinate the base is set on, radio range and licensing, and how corrections get to the rovers or machines — are covered in our permanent GNSS base setup guide, and the underlying positioning concepts in our explainer on how RTK works.
It’s worth being clear about sequence. Decide the site and the correction path first, because those determine whether you need a local radio base at all. Then size the enclosure to the equipment that decision leaves you with. Ordering the box first and finding the radio doesn’t fit is a common and avoidable annoyance.
Talk to us about what needs to fit
We fabricate these in our own Brisbane workshop, which means non-standard sizes and one-off configurations are normal work rather than a special request. Tell us what needs to go inside — receiver, radio or modem, charge controller, battery, and any site-specific gear — and we’ll size it.
CTA: Call 1300 769 359 or email [email protected] to discuss a base station enclosure for your site. Built to order in Brisbane, freighted Australia-wide.

Installing a Stonex Machine Control System

The question that gets asked first
Every plant manager asks the same thing: how long is my machine off the job?
Stonex’s own guidance is that a quick demonstration installation typically takes two to four hours, while a full professional setup may require up to a working day — six to eight hours. \[MFR]
\[VERIFY] — confirm this against Red Edge’s actual experience on Australian machines. Manufacturer figures are usually derived under favourable conditions on common machine types; a real figure from your technicians, stated honestly, is more useful and more credible than a manufacturer optimum.
Either way, plan it into a period when the machine is not on the critical path. Downtime costed at your plant rate is a genuine line item that never appears on a quote.
What gets fitted
Angle sensors on the machine geometry — boom (single or dual), stick, bucket and frame for an excavator; on the blade for a dozer.
GNSS antennas, where the configuration includes them. Cab roof for excavators; for wheel loaders, either the rear frame or the front frame depending on machine design.
The receiver, where fitted.
The display and its mount.
Connection box, cabling and looms.
What separates a good install
The hardware is the same regardless of who fits it. Installation quality is what determines whether the system is still working in two years.
Sensor mounting. Earthmoving machines destroy poorly mounted equipment. Mounts need to be secure, correctly positioned and protected from strikes. A sensor that shifts on its mount produces errors that are difficult to diagnose, because nothing has obviously failed.
Cable routing. Cables need to be routed away from pinch points, heat, and anywhere they will chafe against moving components. Poor routing is the single most common cause of intermittent faults, and intermittent faults are the most expensive kind to chase.
Connector protection. Connectors are where dust and moisture get in. Sealing and positioning matter.
Display position. Visible at a glance without competing with the operator’s view of the work. This is a decision made at fit-out and lived with for years — worth getting right rather than accepting wherever the bracket happened to fit.
Antenna geometry. Where two antennas provide heading, the separation between them affects precision. Follow the specified geometry rather than mounting them where it is convenient.
Machine compatibility
Stonex states installation across a wide range of excavator brands, models and sizes. \[MFR]
Worth confirming specifically for your machines rather than relying on the general statement — particularly for older machines, unusual configurations, or anything with non-standard boom arrangements. Articulated and two-piece booms in particular are a question worth asking directly.
Warranty
Confirm with your machine manufacturer or dealer what aftermarket fitment means for your specific machine and warranty position. This varies by manufacturer and it is worth getting in writing rather than assuming in either direction.
Downtime planning
Schedule around work. Fit during planned maintenance, between jobs, or in a lull.
Don’t do the whole fleet at once. Something will not go smoothly, and you want capacity elsewhere when it does.
Allow for commissioning. Installation is not the end. Configuration, calibration and verification follow, and they take time.
Train close to use. Training delivered weeks before the machine goes into guided production is training that has to be repeated.
Who does it
Red Edge provides Stonex installation, calibration, operator training and technical support.
\[VERIFY] — Red Edge’s live dozer page describes certified technicians using fully-equipped mobile service vehicles throughout Australia. If that is accurate and substantiable, it is a strong point worth making consistently across the site. Confirm before repeating it. Coverage claims are the ones a competitor complaint targets first.
CTA: Talk to Red Edge Resources about installation scheduling and realistic downtime for your machines.

Stonex for Construction and Infrastructure

One job, several requirements
A typical civil project is not one machine control problem. Bulk earthworks, drainage, pad formation, road construction and utilities each have different accuracy demands and different design complexity.
Red Edge supplies Stonex machine control across construction and infrastructure work. Mapping the tiers against the activities helps avoid both over-buying and under-buying.
Bulk earthworks
Large volumes, design surfaces that vary across the site, multiple machines working to a common target.
Fit: 3D Pro with site infrastructure. The design in the cab, machines and rovers on a consistent datum, minimal set-out.
Payoff: reduced rework and over-excavation, less material moved twice, and a shorter trim and correction phase at the end.
Drainage and utilities
Invert levels, consistent fall, tie-ins to existing services.
Fit: 1D or 2D for most runs; 2D½ where correction access already exists; 3D Pro where drainage is part of a wider model.
Payoff: nobody in the trench for routine checking, reduced bedding material from eliminated overcut, and an offsider freed up.
Pad and platform formation
Building pads, commercial slabs, hardstands.
Fit: 2D where the pad is a consistent surface at constant fall; 3D Pro where it varies or ties to a site model.
Payoff: first-pass accuracy, fewer correction passes, consistent finished level across the area.
Road formation
Subgrade, pavement layers, crossfall and transitions.
Fit: 3D Pro. Crossfall changes and superelevation transitions through curves are difficult to execute accurately by eye and demand dense set-out without a model.
Payoff: the material argument. If subgrade is consistently low by even a small margin, every square metre of pavement above it is thicker than designed. Across a road project that is a large volume of expensive material placed for no benefit.
Structures and tie-ins
Working to existing levels — connecting to a live main, matching an existing pavement, tying into an adjacent structure.
Fit: any tier, referenced appropriately to a surveyed point on the existing feature.
Note: guidance does not locate services. Service location procedures apply exactly as before.
The urban complication
Construction work in built-up areas presents a GNSS problem worth planning for. Adjacent buildings block sky view and cause multipath from reflective surfaces.
Multi-constellation support helps materially — more satellites to draw from when the visible sky is restricted. But a constrained urban site is genuinely harder than an open one, and it is worth testing performance on the actual site rather than assuming.
Where GNSS is marginal, the lower tiers working from local references may be more reliable than a 3D solution struggling for a fix. That is not a downgrade; it is choosing the tool that works.
The mixed fleet argument
Civil contractors run mixed fleets — excavators of several brands, a dozer or two, sometimes a loader.
Stonex’s platform approach means one software environment across excavators, dozers and loaders. Practically: one training programme, one support relationship, one spares holding, operators who can move between machines without relearning.
Against a fleet where each machine carries whatever guidance came with it, that consistency is a recurring saving that never appears on a quote.
Starting sensibly
For a contractor new to machine control, the pattern that works:
Fit the highest-utilisation machine on guidance-relevant work
Choose the tier the current work needs, not the flagship
Measure something — rework events, survey call-outs, material against design
Expand on measured results, with an internal champion already developed
The scalability of the platform means starting lower is not a dead end.

Stonex Machine Control for Mining

Where the specifications stop being theoretical
On an open civil site in temperate conditions, most machine control systems perform similarly and the specification sheet is largely academic.
Mining is where the specifications matter. Red Edge supplies Stonex machine control for mining as well as construction and infrastructure, and the mining application deserves separate treatment because the demands are genuinely different.
Restricted sky view
The defining GNSS problem in a pit. Working against a high wall removes a substantial portion of the sky. In a deep pit, the effect compounds — the machine is looking at the sky through an increasingly narrow aperture.
This is where multi-constellation support stops being a datasheet line and becomes the thing that determines whether you can work. GPS, GLONASS, Galileo and BeiDou together — with QZSS’s regionally-focused high-elevation orbits also relevant here — mean roughly four times the pool of satellites. When half the sky is gone, the remaining half is far more likely to contain enough satellites with usable geometry.
It does not solve the problem entirely. Multipath off pit walls and machinery remains, and vertical accuracy stays harder than horizontal. But it is the difference between marginal and workable in many pit environments.
Heat and dust
Stonex states the SMC receivers are rated IP68 with an operating range of −40°C to +80°C. [MFR]
The upper figure is the one that matters here. A receiver on a machine roof in summer, in direct sun, in the Pilbara or central Queensland, is operating at the edge of what electronics tolerate. Equipment that throttles or fails in heat fails when you are working.
IP68 addresses the constant: fine dust. Dust ingress kills electronics gradually and then completely, and sealing rating is the specification that matters most for equipment living permanently on a working machine.
[MFR] Confirm both figures against the current datasheet before publication.
Machine size range
Stonex states STX-DIG installs across excavators from compact and mini machines through to large machines used in mining operations. [MFR]
Worth confirming specifically for the machine classes your customers actually run, because “used in mining operations” covers a wide range and the practical upper limit is a fair question from a mining contractor.
Distance from support
The operational reality that changes everything about how a mining installation should be planned.
A metro contractor with a system down loses hours. A remote mine site loses days, with crew and plant still being paid.
Planning that actually works:
Own your correction source. An on-site base station removes dependence on mobile coverage, which is frequently absent or marginal at remote sites.
Hold critical spares on site. The freight cost of holding a spare is trivial against the standing cost of waiting for one.
Build internal first-line capability. The highest-return investment for a remote operation. Configuration and data issues are the largest category of failure by a wide margin, and someone on site who can diagnose them converts a multi-day wait into an hour’s work.
Complete inductions in advance. A technician attending a mine site needs inductions, medicals and site-specific clearances. Doing that at the point of failure adds days to the response.
Test connectivity before relying on it. At machine level, in the pit, not from the site office.
The safety framing
Reduced grade checking means fewer people on foot around large mining plant, where blind zones are substantial and consequences are severe. That is a genuine exposure reduction.
It is not a detection capability. Machine guidance does not see people, and personnel-plant separation on a mine site continues to be managed by exclusion zones, positive communication, and whatever proximity detection your site requires. Guidance reduces how often someone needs to be there; it does nothing to protect them when they are.
CTA: Red Edge Resources can plan a mining installation including base station infrastructure, spares holding and on-site capability.
Pre-publish flags: [MFR] environmental ratings; machine size range — confirm practical upper limit.

STX-DIG for Batters and Bulk Excavation

Batter formation
Forming a batter to a specified angle by eye is a cycle: form, check, adjust, check again. Each check means somebody on the face with a gauge, standing on freshly disturbed ground, often with plant working above or below.
With slope guidance, the operator sees the achieved angle in the cab and works the face to design on fewer passes. The check becomes a display reading rather than a physical inspection.
Which tier: batter work with fall in one direction can be handled at the lower tiers. Compound batters — a slope with a longitudinal grade along it — need the heading capability that 2D provides, because the system has to understand the machine’s orientation relative to both directions of fall.
Shaped bulk excavation
Where the excavation is a shaped surface rather than a flat bottom — basements, detention basins, complex subgrade, shaped platforms — the design cannot be reduced to a level and a fall.
This is 3D Pro territory. The georeferenced design goes into the cab and the operator works to it directly, seeing cut and fill against the design at their actual position.
The gain is largely the elimination of set-out. Without 3D, a shaped excavation needs extensive pegging and repeated survey to communicate the design to the operator. With it, the shape comes from the model.
Working near edges
Guidance makes it easier to work confidently close to a design edge. That is the point, and it comes with a caution worth stating plainly.
Confidence about the design is not confidence about the ground. The system knows where the design surface is. It does not know whether the material will stand at that angle, whether there is a saturated layer behind the face, whether the crest is undercut, or whether the machine is sitting on competent ground.
Slope stability is a geotechnical question, assessed under the relevant standard, and entirely unaffected by having a guidance system fitted. An operator working precisely to a design batter in unsuitable material is producing an accurate failure.
Crest exclusion zones, machine positioning rules, inspection regimes after rain, and geotechnical assessment appropriate to the height and material all apply exactly as before.
The over-excavation link
Worth naming in this context because the productivity and safety arguments align.
Cutting past a design batter produces a steeper or higher face than the design assumed, plus material to bring back and recompact. Both make the batter worse than designed and both add exposure.
Working accurately to the design is the safer outcome as well as the cheaper one.
Blind digging
A capability that comes into its own here and gets little attention.
When the bucket is out of sight — below water, behind an obstruction, under a structure, at the bottom of a deep cut where the operator’s sightline is poor — the operator normally has no information at all. Stonex specifically identifies blind and underwater digging as tasks the system simplifies, because the bucket position remains visible on screen regardless of whether it is visible in reality. [MFR]
For work in and around water, or in deep constrained excavations, this is not a marginal benefit.
Tier summary for this work
Simple batter, one direction of fall → 1D or 2D depending on the reference arrangement
Compound batter or double slope → 2D minimum
Shaped bulk excavation to a design → 3D Pro
Work tied to a site datum with multiple machines → 3D Pro with site infrastructure
CTA: Red Edge Resources can match an STX-DIG configuration to the excavation work you actually do.
Pre-publish flags: [MFR] blind/underwater digging capability.

STX-DIG for Trenching and Drainage

The application that pays fastest
For a lot of Australian contractors, drainage and service trenching is where machine control produces the clearest return. The work is repetitive, tolerance matters, and the conventional method requires somebody in the excavation.
The conventional method
Pegs set out. A laser and staff, or a boning rod. The operator digs to what looks right. Someone climbs in and checks invert. The operator adjusts. Someone checks again.
Repeated along the run, all day.
What changes
The operator sees the distance to design invert and the achieved fall continuously, in the cab.
No one in the trench for routine checking. The highest-consequence routine task on a drainage crew, eliminated. That is an exposure reduction, achieved by removing the reason for the task — not by any detection capability. The system does not see people, and every rule about excavation entry and plant separation is unchanged.
Consistent fall along the run. Not a fall that averages out across the length while varying within it.
No habitual overcut. Operators build in a margin because cutting short means coming back and cutting deep can be filled. Remove the uncertainty and the margin goes with it — which directly reduces bedding material consumption.
Continuous work. No stop-start cycle for checking. The rhythm changes from dig-stop-check-adjust to a continuous cut.
The offsider is doing something else. On a small crew, this is often the whole business case on its own.
Which tier
1D covers a great deal of drainage work. Depth against a reference, side profile, laser or existing surface as the height reference. For a straight run at consistent fall, it does the job.
2D earns its place where the work has cross-grade as well as longitudinal fall, or where the machine slews frequently and needs to hold the reference relationship. Double slopes are the specific capability.
2D½ is 2D without the laser — elevation from an NTRIP stream instead of a laser receiver on the stick and a laser level on the ground. If you already have correction access, this removes a piece of field equipment from every job.
3D Pro applies where drainage is part of a wider design tied to a site datum, or where multiple services at different levels need to be worked against a model.
Most drainage crews land at 1D or 2D, and there is no virtue in buying past that.
The bedding material argument
The financial case that lands best with drainage contractors.
Over-excavating a trench by even a modest habitual margin means the difference gets filled with bedding material. Along a run of any length, that is a real volume of purchased material, carted and placed, for no design benefit.
Work out your typical overcut margin — most operators will tell you honestly what they take — multiply by your run lengths and trench widths, and cost it at your bedding rate. It is usually a number that makes the conversation short.
Practical points
Bucket configuration is critical. Drainage crews change buckets often. The system needs the correct bucket selected, and wrong bucket selection is the most common cause of accuracy complaints. Build it into the pre-start routine rather than relying on memory.
Guidance does not locate services. A system that knows precisely where the bucket is has no idea what is buried in front of it. All service location procedures apply exactly as before.
Ground support is unaffected. Depth accuracy is not shoring. Trench support requirements under the relevant standard are unchanged.
CTA: Red Edge Resources can specify the right STX-DIG tier for your drainage work — often a lower one than you’d expect.

Stonex Machine Control for Wheel Loaders

The overlooked platform
Machine control discussion defaults to excavators and dozers. Wheel loaders rarely come up, and on operations doing significant material handling and layer work, that is a missed opportunity.
Stonex extends STX-GRADE to wheel loaders, combining onboard sensor data with a dual-antenna GNSS receiver for bucket positioning. [MFR]
Where loaders benefit
Layer placement. Placing material to a consistent layer thickness is fundamental to compaction quality. Over-placement means more compaction effort and more material than the design requires; under-placement means a layer that fails testing. Guidance shows achieved thickness against target directly.
Grade work. Loaders doing pad and trim work benefit from the same blade-to-design reference as any other platform.
Trench backfill. Placing backfill in controlled layers, with visibility of achieved level.
Material handling accuracy. Knowing where the bucket is relative to a design, particularly where the loader is finishing work another machine started.
Stockpile work. Working to defined shapes and levels rather than by eye.
The antenna mounting point
A practical detail worth knowing: Stonex notes that depending on the loader’s design and working conditions, GNSS antennas can be installed on either the rear frame — the cabin structure — or the front frame. [MFR]
That flexibility matters because loaders vary considerably in configuration, and articulated machines present a specific problem: the front and rear frames move relative to each other. Where the antennas sit determines what the system is measuring and how the geometry is calculated.
It is a question worth asking at specification, because it affects both accuracy and the vulnerability of the antennas to damage.
The economics
The loader case is usually not made on the loader alone. It is made on infrastructure already in place.
Where a site already has base station or network corrections, site calibration, design models and a data workflow, the marginal cost of bringing another machine onto that infrastructure is much lower than the first installation. The foundational work is done.
That changes the calculation. A loader that would not justify establishing 3D infrastructure from scratch can readily justify joining infrastructure that already exists.
Consistency across the fleet
There is an argument beyond per-machine productivity.
On a job where excavators, dozers and loaders all work to the same design on the same datum, the earthworks operation converges on the design. Where some machines are guided and others are not, the unguided machines generate work for the guided ones, and the operation needs a trim and correction phase at the end.
That correction phase is a programme item. Reducing it is worth more than the sum of the individual machine efficiencies.
What to confirm
[VERIFY] — confirm which wheel loader configurations Red Edge supplies and supports, and whether STX-GRADE for loaders is currently offered in Australia. Do not publish this article implying availability that has not been confirmed.
[VERIFY] — confirm receiver model for the loader configuration, consistent with the SMC-ONE / SMC-TWO question outstanding across this batch.
Payload and weighing — a separate category
Worth a clear note, because customers conflate them: loader payload weighing is a distinct product category from machine guidance. Guidance tells you where the bucket is; weighing tells you what is in it.
[VERIFY] — confirm Red Edge’s current position in the weighing/payload category before this article references it further. A known gap exists here following the MOBA removal from scope.
CTA: Talk to Red Edge Resources about extending machine control to your loaders.
Pre-publish flags: [VERIFY] Australian availability of loader configuration; receiver model; payload category position.